Multifamily HOMES Project
Reservation review attachments
| Check | Document | File | Uploaded | Actions |
|---|---|---|---|---|
| Energy model (HPXML)
Project
· Energy model (HPXML)
· General
· Uploaded by account · Riley Sample312
The account and the contractor can see it. |
homes-4unit-pass.xml This file is still on the customer portal's server and can't be opened here yet. |
10/21/2026 12:08 PM CST | ||
| Audit Template report
Project
· Audit Template report
· General
· Uploaded by account · Riley Sample312
The account and the contractor can see it. |
audit-template-report-312.pdf This file is still on the customer portal's server and can't be opened here yet. |
10/21/2026 12:08 PM CST |
Reservation review
Complete 10/22/2026 3:36 PM CST by Test user · 31 of 31 checks answered
DOE checks
Multifamily HOMES project (#38), at reservation review. The problems DOE's rebate system flagged on Wisconsin's rebates, worked out on this reservation each time the page opens. Anything that needs attention holds Approve until it is corrected or a reviewer records why approval is safe. What DOE flagged
-
PC-14 · One property type per household
Passed
Every application of this household carries the same property type.
- Application 170 (HOMES_MF)
- Whole multifamily building, 2-4 homes
Rule: Every application of one household carries the same DOE property type. DOE refuses a household reported as two. Reads: The property type of the property behind each of the household's applications. From: DOE anomaly report (#231, kind 8). Confirmed by Matt on 10/14/2026 (#231, question 1 answered A: DOE's own anomaly report confirms the limits).
-
PC-15 · Energy model file on a modeled HOMES project
Passed
An energy model file is on the application. Validate checks it against DOE's rules.
- Units
- 4 units -- under 5, so this building reports to DOE as HPXML.
- File DOE expects
- An HPXML file
- Energy model files
- homes-4unit-pass.xml
Rule: A modeled HOMES project carries its energy model file: HPXML for a property of fewer than 5 units, BuildingSync for 5 or more. DOE refuses a modeled rebate with none. Reads: The application's XML documents and the property's number of units. From: DOE anomaly report (#231, kind 1). Confirmed by Matt on 10/14/2026 (#231, question 1 answered A: DOE's own anomaly report confirms the limits).
-
PC-18 · Duplicate application or measure across all applications
Passed
No other application is for the same home or household, or names the same equipment.
- Searched every application for
- serial numbers (a second project on the building is the duplicate answer, #38)
- Serial numbers
- None on this claim
Rule: No other application is for the same home or the same household, and no installed equipment's serial number is on another application. PC-01 reads the address; this reads every application. Reads: This application's property and household, and its measures' serial numbers; every other submitted application, its measures and its payment requests. From: IRA Procedures Guide, desk review step 7 (unique across all applications), IRA Procedures Guide, Administrator step 1.1.5 (no duplicate record). Confirmed by Matt on 10/21/2026 (#300 (from the procedures review, #297): the HOMES and HEAR Final Rebate Desk Review in the IRA Procedures Guide; these checks hold approval).
-
PC-20 · Not new construction
Passed
The customer portal's building form says this is an existing building.
- Construction
- Existing building
Rule: IRA HOMES and HEAR rebates are for existing buildings. A building the customer portal's building form says is new construction needs attention. Reads: The property record's construction (existing or new construction), from the account's answers on the customer portal's building form. From: IRA Procedures Guide, HOMES and HEAR Final Rebate Desk Review. Confirmed by Matt on 10/21/2026 (#300 (from the procedures review, #297): the HOMES and HEAR Final Rebate Desk Review in the IRA Procedures Guide; these checks hold approval).
Send back for more information
Deny
Assign
Timeline
-
10/22/2026 5:42 PM CST · Test userStaff Payment review Approved for payment
Payment review approved; set to Submit for payment for SPECTRUM. Approved past what held it (#331): The figures this claim is checked against are not all recorded. The redemption review is “In progress”. A claim reaches payment review by passing it, so this one is not ready to be paid.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: The household's post-installation certificate is uploaded to SPECTRUM.
The household's post-installation certificate is uploaded to SPECTRUM.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: Only approved measures contribute to the savings.
Only approved measures contribute to the savings.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: Every measure on the report has a line on the invoice.
Every measure on the report has a line on the invoice.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: The report shows its calibration passed.
The report shows its calibration passed.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: The assessment date is within 3 years of the project completion date.
The assessment date is within 3 years of the project completion date.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: Where the customer is paid, they are moderate income or above.
Where the customer is paid, they are moderate income or above.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: The invoice shows what paying that party requires.
The invoice shows what paying that party requires.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: The payee matches SPECTRUM and Atlas.
The payee matches SPECTRUM and Atlas.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: Moderate and market-rate claims do not show an assessment incentive as paid.
Moderate and market-rate claims do not show an assessment incentive as paid.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: Where an assessment incentive was paid, its cost is not in the project cost.
Where an assessment incentive was paid, its cost is not in the project cost.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: A disadvantaged-community property has its bonus measure present.
A disadvantaged-community property has its bonus measure present.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: Low and moderate income claims show enhanced incentives as yes.
Low and moderate income claims show enhanced incentives as yes.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: The savings recorded here match the savings entered in SPECTRUM.
The savings recorded here match the savings entered in SPECTRUM.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: Therm savings are entered only where the fuel is natural gas.
Therm savings are entered only where the fuel is natural gas.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: The savings match the DOE (HPXML) file within a point or two.
The savings match the DOE (HPXML) file within a point or two.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: The savings are in line with the measure chosen.
The savings are in line with the measure chosen.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: The savings are 19.5% or more.
The savings are 19.5% or more.
-
10/22/2026 5:42 PM CST · Test userStaff Payment review: No other claim on this property address is a duplicate of this one.
No other claim on this property address is a duplicate of this one.
-
10/22/2026 4:54 PM CST · Test userStaff Offer letter produced — Version 1
Reservation – 148 TEST Practice Court, Madison 53703 – Offer Letter. Expires 2027-04-30.
-
10/22/2026 3:36 PM CST · Test userCustomer portal Project Approved
-
10/22/2026 3:36 PM CST · Test userStaff Processing → Approved
Affirmed all of the information is correct
-
10/22/2026 3:36 PM CST · Test userStaff Submitted → Processing
-
10/22/2026 3:36 PM CST · Test userStaff Not started → Submitted
-
10/22/2026 3:36 PM CST · Test userStaff Reservation checklist marked complete
Procedure 2026-09-18
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The offer letter is created, and sent to the contractor once the application is pre-approved. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — SPECTRUM is updated and processing continues per the HOMES Multifamily Custom App Procedure. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The finalized application, the processing notes and any exceptions sent are uploaded to the SPECTRUM application. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Every measure's cost is evaluated. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The proposal meets program requirements. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The description of improvements matches the Asset Score and the application. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Contractor and account name, address and contact details are confirmed. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Energy usage is present. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Equipment usage, efficiencies and specifications match the Asset Score. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The date of completion audit 1 matches the assessment completion date on the application. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Contractor and account name, address and contact details are confirmed. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Checked the characteristics summary for inconsistencies. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The ratings evaluation lets the project go on. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Gross floor area agrees between the summary page and the structures and systems ratings. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Every selected upgrade opportunity is eligible under the program. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Heating and cooling set points are within the standard. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Standard occupancy and operating conditions give the number of occupants and the hours of operation. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The three reports behind a heat pump's modeled savings are on file. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Reviewed the estimated annual site energy savings. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Spot-checked square footage, property type, floor area and year built against the Audit Template. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The contractor is eligible for the measures they are installing. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The contractor is registered and active. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Checked in SPECTRUM: the contractor account and its timeline. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Checked in Atlas, under the contractor account. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The SPECTRUM account and application numbers are recorded on the application, so the contractor dashboard shows them. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The incentive or rebate amount lines up with the allocated percentage. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Every required DOE field on the application is filled in from what the contractor sent. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — A subcontractor's invoice is submitted for any work a subcontractor is doing. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The proposed scope lists eligible measures, each with its own cost, and a project total. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — The income level is taken from the property's qualification. Done
-
10/22/2026 3:36 PM CST · Test userStaff Checklist — Contractor and account contact details are on the application. Done