Tests

Which tests

Run every step on the live sites: the customer portal and this staff portal. Blocking tickets as of 2026-10-22 (docs/qat/blocker_status.csv).

Phase # Test name Role Status
1 1 Pre-qualification Customer Not run
  1. PRE-01: Not run PRE-01 · Not run · ready
  2. PRE-02: Not run PRE-02 · Not run · ready
  3. PRE-03: Not run PRE-03 · Not run · ready
  4. PRE-04: Not run PRE-04 · Not run · ready
  5. PRE-05: Not run PRE-05 · Not run · unblocked by customer #108, please retest
  6. PRE-06: Not run PRE-06 · Not run · ready
  7. PRE-07: Not run PRE-07 · Not run · ready
  8. PRE-08: Not run PRE-08 · Not run · ready
0 pass · 0 fail · 8 not run.
1 2 Approve Customer, Staff Not run
  1. APPROVE-01: Not run APPROVE-01 · Not run · ready
  2. APPROVE-02: Not run APPROVE-02 · Not run · ready
  3. APPROVE-03: Not run APPROVE-03 · Not run · ready
  4. APPROVE-04: Not run APPROVE-04 · Not run · ready
  5. APPROVE-05: Not run APPROVE-05 · Not run · ready
  6. APPROVE-06: Not run APPROVE-06 · Not run · ready
  7. APPROVE-07: Not run APPROVE-07 · Not run · ready
  8. APPROVE-08: Not run APPROVE-08 · Not run · ready
  9. APPROVE-09: Not run APPROVE-09 · Not run · ready
  10. APPROVE-10: Not run APPROVE-10 · Not run · ready
  11. APPROVE-11: Not run APPROVE-11 · Not run · unblocked by customer #108, please retest
  12. APPROVE-12: Not run APPROVE-12 · Not run · unblocked by customer #108, please retest
  13. APPROVE-13: Not run APPROVE-13 · Not run · unblocked by customer #108, please retest
0 pass · 0 fail · 13 not run.
1 3 Deny Customer, Staff Not run
  1. DENY-01: Not run DENY-01 · Not run · ready
  2. DENY-02: Not run DENY-02 · Not run · ready
  3. DENY-03: Not run DENY-03 · Not run · ready
  4. DENY-04: Not run DENY-04 · Not run · ready
  5. DENY-05: Not run DENY-05 · Not run · ready
  6. DENY-06: Not run DENY-06 · Not run · ready
  7. DENY-07: Not run DENY-07 · Not run · ready
  8. DENY-08: Not run DENY-08 · Not run · ready
  9. DENY-09: Not run DENY-09 · Not run · ready
  10. DENY-10: Not run DENY-10 · Not run · ready
  11. DENY-11: Not run DENY-11 · Not run · unblocked by customer #108, please retest
  12. DENY-12: Not run DENY-12 · Not run · unblocked by customer #108, please retest
  13. DENY-13: Not run DENY-13 · Not run · unblocked by customer #108, please retest
0 pass · 0 fail · 13 not run.
1 4 Correct Customer, Staff Not run
  1. CORRECT-01: Not run CORRECT-01 · Not run · ready
  2. CORRECT-02: Not run CORRECT-02 · Not run · ready
  3. CORRECT-03: Not run CORRECT-03 · Not run · ready
  4. CORRECT-04: Not run CORRECT-04 · Not run · ready
  5. CORRECT-05: Not run CORRECT-05 · Not run · ready
  6. CORRECT-06: Not run CORRECT-06 · Not run · ready
  7. CORRECT-07: Not run CORRECT-07 · Not run · ready
  8. CORRECT-08: Not run CORRECT-08 · Not run · ready
  9. CORRECT-09: Not run CORRECT-09 · Not run · ready
  10. CORRECT-10: Not run CORRECT-10 · Not run · ready
  11. CORRECT-11: Not run CORRECT-11 · Not run · unblocked by customer #108, please retest
  12. CORRECT-12: Not run CORRECT-12 · Not run · unblocked by customer #108, please retest
  13. CORRECT-13: Not run CORRECT-13 · Not run · unblocked by customer #108, please retest
  14. CORRECT-14: Not run CORRECT-14 · Not run · unblocked by customer #108, please retest
  15. CORRECT-15: Not run CORRECT-15 · Not run · unblocked by customer #108, please retest
0 pass · 0 fail · 15 not run.
1.5 1 Before you start Staff, Customer Blocked — 3 of 4 steps ready
  1. P1_5-PREP-01: Not run P1_5-PREP-01 · Not run · ready
  2. P1_5-PREP-02: Not run P1_5-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P1_5-PREP-03: Blocked P1_5-PREP-03 · Blocked by customer #107
  4. P1_5-PREP-04: Not run P1_5-PREP-04 · Not run · ready
0 pass · 0 fail · 1 blocked · 3 not run.
1.5 2 First sign-in Customer, Staff Blocked
  1. P1_5-SETUP-01: Blocked P1_5-SETUP-01 · Blocked by customer #107
  2. P1_5-SETUP-02: Blocked P1_5-SETUP-02 · Blocked by customer #107
  3. P1_5-SETUP-03: Blocked P1_5-SETUP-03 · Blocked by customer #107
  4. P1_5-SETUP-04: Blocked P1_5-SETUP-04 · Blocked by customer #107
  5. P1_5-SETUP-05: Blocked P1_5-SETUP-05 · Blocked by customer #107
  6. P1_5-SETUP-06: Blocked P1_5-SETUP-06 · Blocked by customer #107
0 pass · 0 fail · 6 blocked · 0 not run.
1.5 3 Clean up Staff Not run
  1. P1_5-CLEAN-01: Not run P1_5-CLEAN-01 · Not run · unblocked by customer #106, please retest
0 pass · 0 fail · 1 not run.
2 1 Before you start Staff, Customer Not run
  1. P2-PREP-01: Not run P2-PREP-01 · Not run · ready
  2. P2-PREP-02: Not run P2-PREP-02 · Not run · ready
  3. P2-PREP-03: Not run P2-PREP-03 · Not run · ready
  4. P2-PREP-04: Not run P2-PREP-04 · Not run · ready
0 pass · 0 fail · 4 not run.
2 2 Register and approve Contractor, Staff Not run
  1. P2-REG-01: Not run P2-REG-01 · Not run · ready
  2. P2-REG-02: Not run P2-REG-02 · Not run · ready
  3. P2-REG-03: Not run P2-REG-03 · Not run · ready
  4. P2-REG-04: Not run P2-REG-04 · Not run · ready
  5. P2-REG-05: Not run P2-REG-05 · Not run · ready
  6. P2-REG-06: Not run P2-REG-06 · Not run · ready
  7. P2-REG-07: Not run P2-REG-07 · Not run · ready
  8. P2-REG-08: Not run P2-REG-08 · Not run · ready
0 pass · 0 fail · 8 not run.
2 3 Refuse Contractor, Staff Not run
  1. P2-REFUSE-01: Not run P2-REFUSE-01 · Not run · ready
  2. P2-REFUSE-02: Not run P2-REFUSE-02 · Not run · ready
  3. P2-REFUSE-03: Not run P2-REFUSE-03 · Not run · ready
0 pass · 0 fail · 3 not run.
2 4 Pre-loaded contractor Contractor Not run
  1. P2-IMPORT-01: Not run P2-IMPORT-01 · Not run · ready
0 pass · 0 fail · 1 not run.
2 5 Clean up Staff Not run
  1. P2-CLEAN-01: Not run P2-CLEAN-01 · Not run · ready
0 pass · 0 fail · 1 not run.
3 1 Before you start Staff, Customer, Contractor Not run
  1. P3-PREP-01: Not run P3-PREP-01 · Not run · ready
  2. P3-PREP-02: Not run P3-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P3-PREP-03: Not run P3-PREP-03 · Not run · unblocked by customer #108, customer #106, please retest
  4. P3-PREP-04: Not run P3-PREP-04 · Not run · ready
  5. P3-PREP-05: Not run P3-PREP-05 · Not run · ready
0 pass · 0 fail · 5 not run.
3 2 Customer's code Customer, Contractor Not run
  1. P3-CODE-01: Not run P3-CODE-01 · Not run · unblocked by customer #108, please retest
  2. P3-CODE-02: Not run P3-CODE-02 · Not run · unblocked by contractor #96, please retest
  3. P3-CODE-03: Not run P3-CODE-03 · Not run · unblocked by contractor #96, please retest
  4. P3-CODE-04: Not run P3-CODE-04 · Not run · unblocked by contractor #96, please retest
  5. P3-CODE-05: Not run P3-CODE-05 · Not run · unblocked by contractor #96, please retest
  6. P3-CODE-06: Not run P3-CODE-06 · Not run · unblocked by contractor #96, customer #96, customer #97, please retest
  7. P3-CODE-07: Not run P3-CODE-07 · Not run · unblocked by customer #96, customer #97, please retest
0 pass · 0 fail · 7 not run.
3 3 Contractor's invite link Contractor, Customer Not run
  1. P3-INVITE-01: Not run P3-INVITE-01 · Not run · unblocked by contractor #96, please retest
  2. P3-INVITE-02: Not run P3-INVITE-02 · Not run · unblocked by contractor #96, customer #96, please retest
  3. P3-INVITE-03: Not run P3-INVITE-03 · Not run · unblocked by customer #96, customer #97, contractor #96, please retest
  4. P3-INVITE-04: Not run P3-INVITE-04 · Not run · unblocked by customer #96, customer #97, please retest
0 pass · 0 fail · 4 not run.
3 4 Clean up Staff Not run
  1. P3-CLEAN-01: Not run P3-CLEAN-01 · Not run · unblocked by customer #106, please retest
0 pass · 0 fail · 1 not run.
4 1 Before you start Staff, Customer, Contractor Not run
  1. P4-HOMES-PREP-01: Not run P4-HOMES-PREP-01 · Not run · ready
  2. P4-HOMES-PREP-02: Not run P4-HOMES-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P4-HOMES-PREP-03: Not run P4-HOMES-PREP-03 · Not run · ready
  4. P4-HOMES-PREP-04: Not run P4-HOMES-PREP-04 · Not run · ready
  5. P4-HOMES-PREP-05: Not run P4-HOMES-PREP-05 · Not run · ready
  6. P4-HOMES-PREP-06: Not run P4-HOMES-PREP-06 · Not run · ready
  7. P4-HOMES-PREP-07: Not run P4-HOMES-PREP-07 · Not run · ready
0 pass · 0 fail · 7 not run.
4 2 Approve (HPXML, 4 units) Contractor, Customer, Staff Blocked — 6 of 12 steps ready
  1. P4-HOMES-APPROVE-01: Not run P4-HOMES-APPROVE-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-APPROVE-02: Not run P4-HOMES-APPROVE-02 · Not run · unblocked by contractor #82, please retest
  3. P4-HOMES-APPROVE-03: Not run P4-HOMES-APPROVE-03 · Not run · unblocked by contractor #82, please retest
  4. P4-HOMES-APPROVE-04: Not run P4-HOMES-APPROVE-04 · Not run · unblocked by contractor #82, please retest
  5. P4-HOMES-APPROVE-05: Not run P4-HOMES-APPROVE-05 · Not run · unblocked by contractor #82, please retest
  6. P4-HOMES-APPROVE-06: Blocked P4-HOMES-APPROVE-06 · Blocked by customer #150
  7. P4-HOMES-APPROVE-07: Blocked P4-HOMES-APPROVE-07 · Blocked by staff #283
  8. P4-HOMES-APPROVE-08: Blocked P4-HOMES-APPROVE-08 · Blocked by staff #283
  9. P4-HOMES-APPROVE-09: Blocked P4-HOMES-APPROVE-09 · Blocked by staff #283
  10. P4-HOMES-APPROVE-10: Blocked P4-HOMES-APPROVE-10 · Blocked by staff #283
  11. P4-HOMES-APPROVE-11: Not run P4-HOMES-APPROVE-11 · Not run · unblocked by contractor #82, please retest
  12. P4-HOMES-APPROVE-12: Blocked P4-HOMES-APPROVE-12 · Blocked by staff #283
0 pass · 0 fail · 6 blocked · 6 not run.
4 3 Approve (BuildingSync, 8 units) Contractor, Staff, Customer Blocked
  1. P4-HOMES-APPROVE-BS-01: Blocked P4-HOMES-APPROVE-BS-01 · Blocked by contractor #122
  2. P4-HOMES-APPROVE-BS-02: Blocked P4-HOMES-APPROVE-BS-02 · Blocked by contractor #122
  3. P4-HOMES-APPROVE-BS-03: Blocked P4-HOMES-APPROVE-BS-03 · Blocked by contractor #122
  4. P4-HOMES-APPROVE-BS-04: Blocked P4-HOMES-APPROVE-BS-04 · Blocked by staff #283
  5. P4-HOMES-APPROVE-BS-05: Blocked P4-HOMES-APPROVE-BS-05 · Blocked by staff #283
  6. P4-HOMES-APPROVE-BS-06: Blocked P4-HOMES-APPROVE-BS-06 · Blocked by staff #283
  7. P4-HOMES-APPROVE-BS-07: Blocked P4-HOMES-APPROVE-BS-07 · Blocked by contractor #122
0 pass · 0 fail · 7 blocked · 0 not run.
4 4 Mismatch, explained Contractor, Staff Blocked — 3 of 5 steps ready
  1. P4-HOMES-MISMATCH-01: Not run P4-HOMES-MISMATCH-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-MISMATCH-02: Not run P4-HOMES-MISMATCH-02 · Not run · unblocked by contractor #82, please retest
  3. P4-HOMES-MISMATCH-03: Not run P4-HOMES-MISMATCH-03 · Not run · unblocked by contractor #82, please retest
  4. P4-HOMES-MISMATCH-04: Blocked P4-HOMES-MISMATCH-04 · Blocked by staff #283
  5. P4-HOMES-MISMATCH-05: Blocked P4-HOMES-MISMATCH-05 · Blocked by staff #283
0 pass · 0 fail · 2 blocked · 3 not run.
4 5 Send back (failing file) Contractor, Staff Blocked — 3 of 7 steps ready
  1. P4-HOMES-CORRECT-01: Not run P4-HOMES-CORRECT-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-CORRECT-02: Not run P4-HOMES-CORRECT-02 · Not run · unblocked by contractor #82, please retest
  3. P4-HOMES-CORRECT-03: Blocked P4-HOMES-CORRECT-03 · Blocked by staff #283
  4. P4-HOMES-CORRECT-04: Blocked P4-HOMES-CORRECT-04 · Blocked by staff #283
  5. P4-HOMES-CORRECT-05: Blocked P4-HOMES-CORRECT-05 · Blocked by staff #283
  6. P4-HOMES-CORRECT-06: Not run P4-HOMES-CORRECT-06 · Not run · unblocked by contractor #82, please retest
  7. P4-HOMES-CORRECT-07: Blocked P4-HOMES-CORRECT-07 · Blocked by staff #283
0 pass · 0 fail · 4 blocked · 3 not run.
4 6 Send back (BuildingSync) Contractor, Staff Blocked
  1. P4-HOMES-CORRECT-BS-01: Blocked P4-HOMES-CORRECT-BS-01 · Blocked by contractor #122
  2. P4-HOMES-CORRECT-BS-02: Blocked P4-HOMES-CORRECT-BS-02 · Blocked by staff #283
  3. P4-HOMES-CORRECT-BS-03: Blocked P4-HOMES-CORRECT-BS-03 · Blocked by staff #283
  4. P4-HOMES-CORRECT-BS-04: Blocked P4-HOMES-CORRECT-BS-04 · Blocked by contractor #122
  5. P4-HOMES-CORRECT-BS-05: Blocked P4-HOMES-CORRECT-BS-05 · Blocked by staff #283
0 pass · 0 fail · 5 blocked · 0 not run.
4 7 Deny: savings too low Contractor, Staff, Customer Blocked — 4 of 7 steps ready
  1. P4-HOMES-DENY-LOW-01: Not run P4-HOMES-DENY-LOW-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-DENY-LOW-02: Not run P4-HOMES-DENY-LOW-02 · Not run · unblocked by contractor #82, please retest
  3. P4-HOMES-DENY-LOW-03: Not run P4-HOMES-DENY-LOW-03 · Not run · unblocked by contractor #82, please retest
  4. P4-HOMES-DENY-LOW-04: Blocked P4-HOMES-DENY-LOW-04 · Blocked by staff #283
  5. P4-HOMES-DENY-LOW-05: Blocked P4-HOMES-DENY-LOW-05 · Blocked by staff #283
  6. P4-HOMES-DENY-LOW-06: Blocked P4-HOMES-DENY-LOW-06 · Blocked by staff #283
  7. P4-HOMES-DENY-LOW-07: Not run P4-HOMES-DENY-LOW-07 · Not run · unblocked by contractor #82, please retest
0 pass · 0 fail · 3 blocked · 4 not run.
4 8 Deny: wrong building Contractor, Staff, Customer Blocked — 3 of 6 steps ready
  1. P4-HOMES-DENY-BLDG-01: Not run P4-HOMES-DENY-BLDG-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-DENY-BLDG-02: Not run P4-HOMES-DENY-BLDG-02 · Not run · unblocked by contractor #82, please retest
  3. P4-HOMES-DENY-BLDG-03: Blocked P4-HOMES-DENY-BLDG-03 · Blocked by staff #283
  4. P4-HOMES-DENY-BLDG-04: Blocked P4-HOMES-DENY-BLDG-04 · Blocked by staff #283
  5. P4-HOMES-DENY-BLDG-05: Blocked P4-HOMES-DENY-BLDG-05 · Blocked by staff #283
  6. P4-HOMES-DENY-BLDG-06: Not run P4-HOMES-DENY-BLDG-06 · Not run · unblocked by contractor #82, please retest
0 pass · 0 fail · 3 blocked · 3 not run.
4 9 Customer's view Customer Blocked — 1 of 3 steps ready
  1. P4-HOMES-OWNER-01: Not run P4-HOMES-OWNER-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-OWNER-02: Blocked P4-HOMES-OWNER-02 · Blocked by customer #113
  3. P4-HOMES-OWNER-03: Blocked P4-HOMES-OWNER-03 · Blocked by customer #113
0 pass · 0 fail · 2 blocked · 1 not run.
4 10 Clean up Staff Not run
  1. P4-HOMES-CLEAN-01: Not run P4-HOMES-CLEAN-01 · Not run · unblocked by customer #106, please retest
0 pass · 0 fail · 1 not run.
4.1 1 Before you start Staff, Customer, Contractor Not run
  1. P4_1-HEAR-PREP-01: Not run P4_1-HEAR-PREP-01 · Not run · ready
  2. P4_1-HEAR-PREP-02: Not run P4_1-HEAR-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P4_1-HEAR-PREP-03: Not run P4_1-HEAR-PREP-03 · Not run · ready
  4. P4_1-HEAR-PREP-04: Not run P4_1-HEAR-PREP-04 · Not run · ready
  5. P4_1-HEAR-PREP-05: Not run P4_1-HEAR-PREP-05 · Not run · ready
  6. P4_1-HEAR-PREP-06: Not run P4_1-HEAR-PREP-06 · Not run · ready
0 pass · 0 fail · 6 not run.
4.1 2 Approve Contractor, Staff, Customer Blocked
  1. P4_1-HEAR-APPROVE-01: Blocked P4_1-HEAR-APPROVE-01 · Blocked by contractor #133
  2. P4_1-HEAR-APPROVE-02: Blocked P4_1-HEAR-APPROVE-02 · Blocked by contractor #133
  3. P4_1-HEAR-APPROVE-03: Blocked P4_1-HEAR-APPROVE-03 · Blocked by contractor #133
  4. P4_1-HEAR-APPROVE-04: Blocked P4_1-HEAR-APPROVE-04 · Blocked by contractor #133
  5. P4_1-HEAR-APPROVE-05: Blocked P4_1-HEAR-APPROVE-05 · Blocked by contractor #133
  6. P4_1-HEAR-APPROVE-06: Blocked P4_1-HEAR-APPROVE-06 · Blocked by staff #320
  7. P4_1-HEAR-APPROVE-07: Blocked P4_1-HEAR-APPROVE-07 · Blocked by staff #320
  8. P4_1-HEAR-APPROVE-08: Blocked P4_1-HEAR-APPROVE-08 · Blocked by staff #320
  9. P4_1-HEAR-APPROVE-09: Blocked P4_1-HEAR-APPROVE-09 · Blocked by contractor #133
  10. P4_1-HEAR-APPROVE-10: Blocked P4_1-HEAR-APPROVE-10 · Blocked by customer #166
0 pass · 0 fail · 10 blocked · 0 not run.
4.1 3 Deny Contractor, Staff, Customer Blocked
  1. P4_1-HEAR-DENY-01: Blocked P4_1-HEAR-DENY-01 · Blocked by contractor #133
  2. P4_1-HEAR-DENY-02: Blocked P4_1-HEAR-DENY-02 · Blocked by staff #320
  3. P4_1-HEAR-DENY-03: Blocked P4_1-HEAR-DENY-03 · Blocked by contractor #133
  4. P4_1-HEAR-DENY-04: Blocked P4_1-HEAR-DENY-04 · Blocked by customer #166
0 pass · 0 fail · 4 blocked · 0 not run.
4.1 4 Send back Contractor, Staff Blocked
  1. P4_1-HEAR-CORRECT-01: Blocked P4_1-HEAR-CORRECT-01 · Blocked by contractor #133
  2. P4_1-HEAR-CORRECT-02: Blocked P4_1-HEAR-CORRECT-02 · Blocked by staff #320
  3. P4_1-HEAR-CORRECT-03: Blocked P4_1-HEAR-CORRECT-03 · Blocked by contractor #133
  4. P4_1-HEAR-CORRECT-04: Blocked P4_1-HEAR-CORRECT-04 · Blocked by contractor #133
  5. P4_1-HEAR-CORRECT-05: Blocked P4_1-HEAR-CORRECT-05 · Blocked by staff #320
0 pass · 0 fail · 5 blocked · 0 not run.
4.1 5 Clean up Staff Not run
  1. P4_1-HEAR-CLEAN-01: Not run P4_1-HEAR-CLEAN-01 · Not run · unblocked by customer #106, please retest
0 pass · 0 fail · 1 not run.
5 1 Before you start Staff, Customer, Contractor Not run
  1. P5-PREP-01: Not run P5-PREP-01 · Not run · ready
  2. P5-PREP-02: Not run P5-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P5-PREP-03: Not run P5-PREP-03 · Not run · ready
  4. P5-PREP-04: Not run P5-PREP-04 · Not run · unblocked by customer #108, please retest
  5. P5-PREP-05: Not run P5-PREP-05 · Not run · ready
0 pass · 0 fail · 5 not run.
5 2 Submit for payment Contractor, Customer, Staff Blocked — 2 of 5 steps ready
  1. P5-SUBMIT-01: Blocked P5-SUBMIT-01 · Blocked by contractor #133
  2. P5-SUBMIT-02: Blocked P5-SUBMIT-02 · Blocked by contractor #133
  3. P5-SUBMIT-03: Not run P5-SUBMIT-03 · Not run · ready
  4. P5-SUBMIT-04: Not run P5-SUBMIT-04 · Not run · unblocked by contractor #80, staff #227, please retest
  5. P5-SUBMIT-05: Blocked P5-SUBMIT-05 · Blocked by staff #289, staff #320
0 pass · 0 fail · 3 blocked · 2 not run.
5 3 Clean up Staff Not run
  1. P5-CLEAN-01: Not run P5-CLEAN-01 · Not run · unblocked by customer #106, please retest
0 pass · 0 fail · 1 not run.
5.5 1 Before you start Staff, Customer Not run
  1. P5_5-PREP-01: Not run P5_5-PREP-01 · Not run · ready
  2. P5_5-PREP-02: Not run P5_5-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P5_5-PREP-03: Not run P5_5-PREP-03 · Not run · unblocked by contractor #63, please retest
  4. P5_5-PREP-04: Not run P5_5-PREP-04 · Not run · ready
0 pass · 0 fail · 4 not run.
5.5 2 Quality visit Staff, Customer Not run
  1. P5_5-VISIT-01: Not run P5_5-VISIT-01 · Not run · ready
  2. P5_5-VISIT-02: Not run P5_5-VISIT-02 · Not run · ready
  3. P5_5-VISIT-03: Not run P5_5-VISIT-03 · Not run · ready
  4. P5_5-VISIT-04: Not run P5_5-VISIT-04 · Not run · ready
  5. P5_5-VISIT-05: Not run P5_5-VISIT-05 · Not run · ready
  6. P5_5-VISIT-06: Not run P5_5-VISIT-06 · Not run · ready
  7. P5_5-VISIT-07: Not run P5_5-VISIT-07 · Not run · ready
  8. P5_5-VISIT-08: Not run P5_5-VISIT-08 · Not run · ready
0 pass · 0 fail · 8 not run.
5.5 3 Automatic picking Staff Not run
  1. P5_5-PICK-01: Not run P5_5-PICK-01 · Not run · unblocked by staff #208, staff #228, please retest
  2. P5_5-PICK-02: Not run P5_5-PICK-02 · Not run · unblocked by staff #208, staff #228, please retest
  3. P5_5-PICK-03: Not run P5_5-PICK-03 · Not run · unblocked by staff #208, staff #228, please retest
  4. P5_5-PICK-04: Not run P5_5-PICK-04 · Not run · unblocked by staff #208, staff #228, please retest
0 pass · 0 fail · 4 not run.
5.5 4 Clean up Staff Not run
  1. P5_5-CLEAN-01: Not run P5_5-CLEAN-01 · Not run · unblocked by customer #106, please retest
0 pass · 0 fail · 1 not run.
6 1 Before you start Staff, Customer, Contractor Not run
  1. P6-PREP-01: Not run P6-PREP-01 · Not run · ready
  2. P6-PREP-02: Not run P6-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P6-PREP-03: Not run P6-PREP-03 · Not run · ready
  4. P6-PREP-04: Not run P6-PREP-04 · Not run · unblocked by contractor #63, please retest
  5. P6-PREP-05: Not run P6-PREP-05 · Not run · ready
0 pass · 0 fail · 5 not run.
6 2 Approve and pay Staff, Customer, Contractor Blocked — 5 of 6 steps ready
  1. P6-APPROVE-01: Not run P6-APPROVE-01 · Not run · unblocked by contractor #80, staff #227, please retest
  2. P6-APPROVE-02: Not run P6-APPROVE-02 · Not run · unblocked by contractor #80, staff #227, please retest
  3. P6-APPROVE-03: Blocked P6-APPROVE-03 · Blocked by staff #322
  4. P6-APPROVE-04: Not run P6-APPROVE-04 · Not run · ready
  5. P6-APPROVE-05: Not run P6-APPROVE-05 · Not run · ready
  6. P6-APPROVE-06: Not run P6-APPROVE-06 · Not run · unblocked by contractor #80, staff #227, please retest
0 pass · 0 fail · 1 blocked · 5 not run.
6 3 Send back Staff, Contractor Not run
  1. P6-CORRECT-01: Not run P6-CORRECT-01 · Not run · unblocked by contractor #80, staff #227, please retest
  2. P6-CORRECT-02: Not run P6-CORRECT-02 · Not run · unblocked by contractor #80, staff #227, please retest
  3. P6-CORRECT-03: Not run P6-CORRECT-03 · Not run · unblocked by contractor #63, contractor #80, staff #227, please retest
  4. P6-CORRECT-04: Not run P6-CORRECT-04 · Not run · unblocked by contractor #80, staff #227, please retest
0 pass · 0 fail · 4 not run.
6 4 Refuse Staff, Customer, Contractor Not run
  1. P6-REFUSE-01: Not run P6-REFUSE-01 · Not run · unblocked by contractor #80, staff #227, please retest
  2. P6-REFUSE-02: Not run P6-REFUSE-02 · Not run · ready
  3. P6-REFUSE-03: Not run P6-REFUSE-03 · Not run · unblocked by contractor #80, staff #227, please retest
0 pass · 0 fail · 3 not run.
6 5 Clean up Staff Not run
  1. P6-CLEAN-01: Not run P6-CLEAN-01 · Not run · unblocked by customer #106, please retest
0 pass · 0 fail · 1 not run.
7 1 Before you start Staff, Customer Not run
  1. P7-PREP-01: Not run P7-PREP-01 · Not run · ready
  2. P7-PREP-02: Not run P7-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P7-PREP-03: Not run P7-PREP-03 · Not run · unblocked by customer #108, please retest
  4. P7-PREP-04: Not run P7-PREP-04 · Not run · ready
0 pass · 0 fail · 4 not run.
7 2 DOE bulk report Staff Blocked
  1. P7-REPORT-01: Blocked P7-REPORT-01 · Blocked by RnD #31, RnD #53 milestone 7
  2. P7-REPORT-02: Blocked P7-REPORT-02 · Blocked by RnD #31, RnD #53 milestone 7
  3. P7-REPORT-03: Blocked P7-REPORT-03 · Blocked by RnD #31, RnD #53 milestone 7
  4. P7-REPORT-04: Blocked P7-REPORT-04 · Blocked by RnD #31, RnD #53 milestone 7
  5. P7-REPORT-05: Blocked P7-REPORT-05 · Blocked by RnD #31, RnD #53 milestone 7
  6. P7-REPORT-06: Blocked P7-REPORT-06 · Blocked by RnD #31
  7. P7-REPORT-07: Blocked P7-REPORT-07 · Blocked by RnD #31, RnD #53 milestone 7
  8. P7-REPORT-08: Blocked P7-REPORT-08 · Blocked by RnD #31, a real paid multifamily rebate, none yet
0 pass · 0 fail · 8 blocked · 0 not run.
7 3 PNNL sandbox upload Staff Blocked
  1. P7-UPLOAD-01: Blocked P7-UPLOAD-01 · Blocked by RnD #31, PNNL sandbox access, no ticket
0 pass · 0 fail · 1 blocked · 0 not run.
7 4 Clean up Staff Not run
  1. P7-CLEAN-01: Not run P7-CLEAN-01 · Not run · unblocked by customer #106, please retest
0 pass · 0 fail · 1 not run.

Pre-qualification

0 pass · 0 fail · 8 not run.

  1. PRE-01: Not run PRE-01 · Not run · ready
  2. PRE-02: Not run PRE-02 · Not run · ready
  3. PRE-03: Not run PRE-03 · Not run · ready
  4. PRE-04: Not run PRE-04 · Not run · ready
  5. PRE-05: Not run PRE-05 · Not run · unblocked by customer #108, please retest
  6. PRE-06: Not run PRE-06 · Not run · ready
  7. PRE-07: Not run PRE-07 · Not run · ready
  8. PRE-08: Not run PRE-08 · Not run · ready

PRE-01

Customer Not run
Do this
Choose an IRA staff tester account with access to both live portals.
Expected
Both portals admit the tester; an ordinary customer cannot open staff review screens.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for PRE-01 yet.

PRE-02 →

PRE-02

Customer Not run
Do this
Prepare three separate made-up multifamily building identities labeled APPROVE, DENY and CORRECT.
Expected
Each case has a different building and a unique name or address that can be matched in both portals.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for PRE-02 yet.

← PRE-01 PRE-03 →

PRE-03

Customer Not run
Do this
Prepare harmless sample documents without real names, income or account numbers.
Expected
The files can be uploaded for testing without exposing a real person’s information.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for PRE-03 yet.

← PRE-02 PRE-04 →

PRE-04

Customer Not run
Do this
Check that the live new-customer entry and confirmation email work.
Expected
A new test customer can create an account, confirm its email and sign in; otherwise mark later sign-up steps Blocked.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for PRE-04 yet.

← PRE-03 PRE-05 →

PRE-05

Customer Not run
Do this
Check that staff can save a live building decision and issue a building code.
Expected
A maintainer has cleared staff portal #186 with a successful live check; otherwise mark decision steps Blocked.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for PRE-05 yet.

← PRE-04 PRE-06 →

PRE-06

Customer Not run
Do this
Record the tester name and a case ID for each building.
Expected
Every completed row can be traced to one tester and one building without using real personal details.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for PRE-06 yet.

← PRE-05 PRE-07 →

PRE-07

Customer Not run
Do this
Use Yes for a step that worked, No for a tried step that failed, and Blocked for a step you could not try.
Expected
Failed and unavailable steps are not reported as passes.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for PRE-07 yet.

← PRE-06 PRE-08 →

PRE-08

Customer Not run
Do this
Arrange removal of the three made-up accounts, buildings and uploaded samples after the testing round.
Expected
The responsible person and cleanup plan are recorded before testing begins.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for PRE-08 yet.

← PRE-07

Approve

0 pass · 0 fail · 13 not run.

  1. APPROVE-01: Not run APPROVE-01 · Not run · ready
  2. APPROVE-02: Not run APPROVE-02 · Not run · ready
  3. APPROVE-03: Not run APPROVE-03 · Not run · ready
  4. APPROVE-04: Not run APPROVE-04 · Not run · ready
  5. APPROVE-05: Not run APPROVE-05 · Not run · ready
  6. APPROVE-06: Not run APPROVE-06 · Not run · ready
  7. APPROVE-07: Not run APPROVE-07 · Not run · ready
  8. APPROVE-08: Not run APPROVE-08 · Not run · ready
  9. APPROVE-09: Not run APPROVE-09 · Not run · ready
  10. APPROVE-10: Not run APPROVE-10 · Not run · ready
  11. APPROVE-11: Not run APPROVE-11 · Not run · unblocked by customer #108, please retest
  12. APPROVE-12: Not run APPROVE-12 · Not run · unblocked by customer #108, please retest
  13. APPROVE-13: Not run APPROVE-13 · Not run · unblocked by customer #108, please retest

APPROVE-01

Customer Not run
Do this
Open the live portal’s new multifamily customer path in a fresh browser session.
Expected
The page identifies the multifamily owner path and offers account creation.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-01 yet.

APPROVE-02 →

APPROVE-02

Customer Not run
Do this
Create a new account with an invented name and a unique test email for this case.
Expected
The portal accepts the account request and tells the customer how to confirm the email.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-02 yet.

← APPROVE-01 APPROVE-03 →

APPROVE-03

Customer Not run
Do this
Open the confirmation email and complete its link.
Expected
The account becomes active and the customer reaches the portal signed in.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-03 yet.

← APPROVE-02 APPROVE-04 →

APPROVE-04

Customer Not run
Do this
Sign out, then sign in again with the same test account.
Expected
The same account opens and any saved property remains available.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-04 yet.

← APPROVE-03 APPROVE-05 →

APPROVE-05

Customer Not run
Do this
Add a named multifamily property and one building with at least four occupied units.
Expected
The property, building and occupied-unit count appear under the test account.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-05 yet.

← APPROVE-04 APPROVE-06 →

APPROVE-06

Customer Not run
Do this
Use one permitted income-proof route and upload the harmless sample document for enough units.
Expected
The building shows the documents and the number of occupied units still needed for review.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-06 yet.

← APPROVE-05 APPROVE-07 →

APPROVE-07

Customer Not run
Do this
Review the building’s progress and open its Sign and send step.
Expected
The page states what is ready, names any missing proof and asks who is signing.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-07 yet.

← APPROVE-06 APPROVE-08 →

APPROVE-08

Customer Not run
Do this
Sign and send this building for income review.
Expected
The building says it was sent to program staff and normal edits are locked during review.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-08 yet.

← APPROVE-07 APPROVE-09 →

APPROVE-09

Staff Not run
Do this
Sign in to the live staff portal and find this building’s Multifamily Income Qualification.
Expected
The record matches the test account, building and submitted status; it is not another case.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-09 yet.

← APPROVE-08 APPROVE-10 →

APPROVE-10

Staff Not run
Do this
Open each sample attachment from the building’s review page.
Expected
The actual file opens for staff; seeing only its filename does not count as Yes.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-10 yet.

← APPROVE-09 APPROVE-11 →

APPROVE-11

Staff Not run
Do this
Confirm the required unit or housing-program proof and approve this building.
Expected
The decision saves as Approved and issues an LEA or MEA building code with an expiry date.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-11 yet.

← APPROVE-10 APPROVE-12 →

APPROVE-12

Customer Not run
Do this
Return to the same building in the customer portal and refresh it.
Expected
The building says Approved and shows its code and valid-until date.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-12 yet.

← APPROVE-11 APPROVE-13 →

APPROVE-13

Customer Not run
Do this
Compare the code prefix with the approved income tier.
Expected
A low-income result has LEA; a moderate-income result has MEA. A wrong prefix is No, even if a code exists.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for APPROVE-13 yet.

← APPROVE-12

Deny

0 pass · 0 fail · 13 not run.

  1. DENY-01: Not run DENY-01 · Not run · ready
  2. DENY-02: Not run DENY-02 · Not run · ready
  3. DENY-03: Not run DENY-03 · Not run · ready
  4. DENY-04: Not run DENY-04 · Not run · ready
  5. DENY-05: Not run DENY-05 · Not run · ready
  6. DENY-06: Not run DENY-06 · Not run · ready
  7. DENY-07: Not run DENY-07 · Not run · ready
  8. DENY-08: Not run DENY-08 · Not run · ready
  9. DENY-09: Not run DENY-09 · Not run · ready
  10. DENY-10: Not run DENY-10 · Not run · ready
  11. DENY-11: Not run DENY-11 · Not run · unblocked by customer #108, please retest
  12. DENY-12: Not run DENY-12 · Not run · unblocked by customer #108, please retest
  13. DENY-13: Not run DENY-13 · Not run · unblocked by customer #108, please retest

DENY-01

Customer Not run
Do this
Open the live portal’s new multifamily customer path in a fresh browser session.
Expected
The page identifies the multifamily owner path and offers account creation.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-01 yet.

DENY-02 →

DENY-02

Customer Not run
Do this
Create a new account with an invented name and a unique test email for this case.
Expected
The portal accepts the account request and tells the customer how to confirm the email.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-02 yet.

← DENY-01 DENY-03 →

DENY-03

Customer Not run
Do this
Open the confirmation email and complete its link.
Expected
The account becomes active and the customer reaches the portal signed in.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-03 yet.

← DENY-02 DENY-04 →

DENY-04

Customer Not run
Do this
Sign out, then sign in again with the same test account.
Expected
The same account opens and any saved property remains available.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-04 yet.

← DENY-03 DENY-05 →

DENY-05

Customer Not run
Do this
Add a named multifamily property and one building with at least four occupied units.
Expected
The property, building and occupied-unit count appear under the test account.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-05 yet.

← DENY-04 DENY-06 →

DENY-06

Customer Not run
Do this
Use one permitted income-proof route and upload the harmless sample document for enough units.
Expected
The building shows the documents and the number of occupied units still needed for review.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-06 yet.

← DENY-05 DENY-07 →

DENY-07

Customer Not run
Do this
Review the building’s progress and open its Sign and send step.
Expected
The page states what is ready, names any missing proof and asks who is signing.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-07 yet.

← DENY-06 DENY-08 →

DENY-08

Customer Not run
Do this
Sign and send this building for income review.
Expected
The building says it was sent to program staff and normal edits are locked during review.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-08 yet.

← DENY-07 DENY-09 →

DENY-09

Staff Not run
Do this
Sign in to the live staff portal and find this building’s Multifamily Income Qualification.
Expected
The record matches the test account, building and submitted status; it is not another case.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-09 yet.

← DENY-08 DENY-10 →

DENY-10

Staff Not run
Do this
Open each sample attachment from the building’s review page.
Expected
The actual file opens for staff; seeing only its filename does not count as Yes.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-10 yet.

← DENY-09 DENY-11 →

DENY-11

Staff Not run
Do this
Deny this building and enter a plain-language reason that the customer can act on.
Expected
The denial saves on this building and the staff record keeps the reason.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-11 yet.

← DENY-10 DENY-12 →

DENY-12

Customer Not run
Do this
Return to the same building in the customer portal and refresh it.
Expected
The building says Not approved and clearly shows the reason for denial; no approval code appears.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-12 yet.

← DENY-11 DENY-13 →

DENY-13

Customer Not run
Do this
Reopen the APPROVE building and compare its result.
Expected
The DENY decision did not change the separate APPROVE case.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for DENY-13 yet.

← DENY-12

Correct

0 pass · 0 fail · 15 not run.

  1. CORRECT-01: Not run CORRECT-01 · Not run · ready
  2. CORRECT-02: Not run CORRECT-02 · Not run · ready
  3. CORRECT-03: Not run CORRECT-03 · Not run · ready
  4. CORRECT-04: Not run CORRECT-04 · Not run · ready
  5. CORRECT-05: Not run CORRECT-05 · Not run · ready
  6. CORRECT-06: Not run CORRECT-06 · Not run · ready
  7. CORRECT-07: Not run CORRECT-07 · Not run · ready
  8. CORRECT-08: Not run CORRECT-08 · Not run · ready
  9. CORRECT-09: Not run CORRECT-09 · Not run · ready
  10. CORRECT-10: Not run CORRECT-10 · Not run · ready
  11. CORRECT-11: Not run CORRECT-11 · Not run · unblocked by customer #108, please retest
  12. CORRECT-12: Not run CORRECT-12 · Not run · unblocked by customer #108, please retest
  13. CORRECT-13: Not run CORRECT-13 · Not run · unblocked by customer #108, please retest
  14. CORRECT-14: Not run CORRECT-14 · Not run · unblocked by customer #108, please retest
  15. CORRECT-15: Not run CORRECT-15 · Not run · unblocked by customer #108, please retest

CORRECT-01

Customer Not run
Do this
Open the live portal’s new multifamily customer path in a fresh browser session.
Expected
The page identifies the multifamily owner path and offers account creation.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-01 yet.

CORRECT-02 →

CORRECT-02

Customer Not run
Do this
Create a new account with an invented name and a unique test email for this case.
Expected
The portal accepts the account request and tells the customer how to confirm the email.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-02 yet.

← CORRECT-01 CORRECT-03 →

CORRECT-03

Customer Not run
Do this
Open the confirmation email and complete its link.
Expected
The account becomes active and the customer reaches the portal signed in.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-03 yet.

← CORRECT-02 CORRECT-04 →

CORRECT-04

Customer Not run
Do this
Sign out, then sign in again with the same test account.
Expected
The same account opens and any saved property remains available.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-04 yet.

← CORRECT-03 CORRECT-05 →

CORRECT-05

Customer Not run
Do this
Add a named multifamily property and one building with at least four occupied units.
Expected
The property, building and occupied-unit count appear under the test account.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-05 yet.

← CORRECT-04 CORRECT-06 →

CORRECT-06

Customer Not run
Do this
Use one permitted income-proof route and upload the harmless sample document for enough units.
Expected
The building shows the documents and the number of occupied units still needed for review.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-06 yet.

← CORRECT-05 CORRECT-07 →

CORRECT-07

Customer Not run
Do this
Review the building’s progress and open its Sign and send step.
Expected
The page states what is ready, names any missing proof and asks who is signing.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-07 yet.

← CORRECT-06 CORRECT-08 →

CORRECT-08

Customer Not run
Do this
Sign and send this building for income review.
Expected
The building says it was sent to program staff and normal edits are locked during review.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-08 yet.

← CORRECT-07 CORRECT-09 →

CORRECT-09

Staff Not run
Do this
Sign in to the live staff portal and find this building’s Multifamily Income Qualification.
Expected
The record matches the test account, building and submitted status; it is not another case.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-09 yet.

← CORRECT-08 CORRECT-10 →

CORRECT-10

Staff Not run
Do this
Open each sample attachment from the building’s review page.
Expected
The actual file opens for staff; seeing only its filename does not count as Yes.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-10 yet.

← CORRECT-09 CORRECT-11 →

CORRECT-11

Staff Not run
Do this
Send this building back with one specific request for a correction.
Expected
The staff record shows Sent back and keeps the request tied to this building.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-11 yet.

← CORRECT-10 CORRECT-12 →

CORRECT-12

Customer Not run
Do this
Return to the same building in the customer portal and refresh it.
Expected
The building says Sent back to you and shows what needs correction.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-12 yet.

← CORRECT-11 CORRECT-13 →

CORRECT-13

Customer Not run
Do this
Make the requested change or replace the sample document.
Expected
The edit is allowed after send-back and the updated information appears on this building.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-13 yet.

← CORRECT-12 CORRECT-14 →

CORRECT-14

Customer Not run
Do this
Sign and send this building again.
Expected
The updated building returns to staff review and customer edits lock again.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-14 yet.

← CORRECT-13 CORRECT-15 →

CORRECT-15

Staff Not run
Do this
Reopen the same building on the staff portal.
Expected
Staff can see the new submission and the corrected information or replacement document.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for CORRECT-15 yet.

← CORRECT-14

Before you start

0 pass · 0 fail · 1 blocked · 3 not run.

  1. P1_5-PREP-01: Not run P1_5-PREP-01 · Not run · ready
  2. P1_5-PREP-02: Not run P1_5-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P1_5-PREP-03: Blocked P1_5-PREP-03 · Blocked by customer #107
  4. P1_5-PREP-04: Not run P1_5-PREP-04 · Not run · ready

P1_5-PREP-01

Staff Not run
Do this
Sign in to the live staff portal with your own account and open Tests.
Expected
Tests opens. Your name shows on the results you record.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-PREP-01 yet.

P1_5-PREP-02 →

P1_5-PREP-02

Customer Not run
Do this
Sign in to the live customer portal as this phase's named test building owner.
Expected
You are signed in as the test owner, not as a real customer.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-PREP-02 yet.

← P1_5-PREP-01 P1_5-PREP-03 →

P1_5-PREP-03

Staff Blocked
Do this
Get one pre-loaded test customer from the import, with an email inbox you can open.
Expected
The customer's record already holds an approved income qualification with a code.

Blocked by customer #107.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-PREP-03 yet.

← P1_5-PREP-02 P1_5-PREP-04 →

P1_5-PREP-04

Staff Not run
Do this
Write the case ID for each test of this phase in its first step's note.
Expected
Every test in this phase has a case ID that names its made-up records.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-PREP-04 yet.

← P1_5-PREP-03

First sign-in

0 pass · 0 fail · 6 blocked · 0 not run.

  1. P1_5-SETUP-01: Blocked P1_5-SETUP-01 · Blocked by customer #107
  2. P1_5-SETUP-02: Blocked P1_5-SETUP-02 · Blocked by customer #107
  3. P1_5-SETUP-03: Blocked P1_5-SETUP-03 · Blocked by customer #107
  4. P1_5-SETUP-04: Blocked P1_5-SETUP-04 · Blocked by customer #107
  5. P1_5-SETUP-05: Blocked P1_5-SETUP-05 · Blocked by customer #107
  6. P1_5-SETUP-06: Blocked P1_5-SETUP-06 · Blocked by customer #107

P1_5-SETUP-01

Customer Blocked
Do this
Open the live customer portal in a fresh browser session and sign in with the pre-loaded email.
Expected
The portal knows the email and offers to set a password. It does not ask you to create an account.

Blocked by customer #107.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-SETUP-01 yet.

P1_5-SETUP-02 →

P1_5-SETUP-02

Customer Blocked
Do this
Follow the set-a-password link sent to that email and choose a password.
Expected
The password is accepted and you land in the portal, signed in.

Blocked by customer #107.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-SETUP-02 yet.

← P1_5-SETUP-01 P1_5-SETUP-03 →

P1_5-SETUP-03

Customer Blocked
Do this
Open your property without starting an application.
Expected
Your income qualification code and its expiry date show. You filled in no application.

Blocked by customer #107.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-SETUP-03 yet.

← P1_5-SETUP-02 P1_5-SETUP-04 →

P1_5-SETUP-04

Customer Blocked
Do this
Sign out, then sign in again with the new password.
Expected
Sign-in works and the same code and expiry date show.

Blocked by customer #107.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-SETUP-04 yet.

← P1_5-SETUP-03 P1_5-SETUP-05 →

P1_5-SETUP-05

Staff Blocked
Do this
On the live staff portal, find the same customer.
Expected
The account shows the same code and expiry date the customer sees.

Blocked by customer #107.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-SETUP-05 yet.

← P1_5-SETUP-04 P1_5-SETUP-06 →

P1_5-SETUP-06

Customer Blocked
Do this
In a fresh browser session, try to create a new account with the pre-loaded email.
Expected
The portal says an account already exists and offers sign-in. No second account is made.

Blocked by customer #107.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-SETUP-06 yet.

← P1_5-SETUP-05

Clean up

0 pass · 0 fail · 1 not run.

  1. P1_5-CLEAN-01: Not run P1_5-CLEAN-01 · Not run · unblocked by customer #106, please retest

P1_5-CLEAN-01

Staff Not run
Do this
Run the documented cleanup for this phase's test accounts, and record the before and after counts.
Expected
Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P1_5-CLEAN-01 yet.

Before you start

0 pass · 0 fail · 4 not run.

  1. P2-PREP-01: Not run P2-PREP-01 · Not run · ready
  2. P2-PREP-02: Not run P2-PREP-02 · Not run · ready
  3. P2-PREP-03: Not run P2-PREP-03 · Not run · ready
  4. P2-PREP-04: Not run P2-PREP-04 · Not run · ready

P2-PREP-01

Staff Not run
Do this
Sign in to the live staff portal with your own account and open Tests.
Expected
Tests opens. Your name shows on the results you record.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-PREP-01 yet.

P2-PREP-02 →

P2-PREP-02

Customer Not run
Do this
Sign in to the live customer portal as this phase's named test building owner.
Expected
You are signed in as the test owner, not as a real customer.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-PREP-02 yet.

← P2-PREP-01 P2-PREP-03 →

P2-PREP-03

Staff Not run
Do this
Choose two made-up companies, labeled P2-APPROVE and P2-REFUSE, each with its own email inbox.
Expected
Each company has a unique name, address and contact email you can open.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-PREP-03 yet.

← P2-PREP-02 P2-PREP-04 →

P2-PREP-04

Staff Not run
Do this
Write the case ID for each test of this phase in its first step's note.
Expected
Every test in this phase has a case ID that names its made-up records.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-PREP-04 yet.

← P2-PREP-03

Register and approve

0 pass · 0 fail · 8 not run.

  1. P2-REG-01: Not run P2-REG-01 · Not run · ready
  2. P2-REG-02: Not run P2-REG-02 · Not run · ready
  3. P2-REG-03: Not run P2-REG-03 · Not run · ready
  4. P2-REG-04: Not run P2-REG-04 · Not run · ready
  5. P2-REG-05: Not run P2-REG-05 · Not run · ready
  6. P2-REG-06: Not run P2-REG-06 · Not run · ready
  7. P2-REG-07: Not run P2-REG-07 · Not run · ready
  8. P2-REG-08: Not run P2-REG-08 · Not run · ready

P2-REG-01

Contractor Not run
Do this
Open the live contractor portal's registration in a fresh browser session and register P2-APPROVE.
Expected
The registration asks for the company, its contacts, its services and its documents.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REG-01 yet.

P2-REG-02 →

P2-REG-02

Contractor Not run
Do this
Fill in every required field, upload harmless sample documents, and submit.
Expected
The portal confirms the registration was sent and shows it waiting for review.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REG-02 yet.

← P2-REG-01 P2-REG-03 →

P2-REG-03

Contractor Not run
Do this
Open P2-APPROVE's email inbox.
Expected
An email confirms the registration was received.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REG-03 yet.

← P2-REG-02 P2-REG-04 →

P2-REG-04

Staff Not run
Do this
On the live staff portal, open Contractors and find P2-APPROVE's registration.
Expected
The registration shows its documents and its checks, including the Do Not Pay check.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REG-04 yet.

← P2-REG-03 P2-REG-05 →

P2-REG-05

Staff Not run
Do this
Open each sample document from the registration.
Expected
Each document opens.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REG-05 yet.

← P2-REG-04 P2-REG-06 →

P2-REG-06

Staff Not run
Do this
Tick "reviewed all documents" and approve P2-APPROVE.
Expected
The approval saves and the registration shows Approved, with your name and the time.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REG-06 yet.

← P2-REG-05 P2-REG-07 →

P2-REG-07

Contractor Not run
Do this
Sign in to the live contractor portal as P2-APPROVE.
Expected
The company shows as approved and can start a project.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REG-07 yet.

← P2-REG-06 P2-REG-08 →

P2-REG-08

Contractor Not run
Do this
Open P2-APPROVE's email inbox.
Expected
An email says the company is approved.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REG-08 yet.

← P2-REG-07

Refuse

0 pass · 0 fail · 3 not run.

  1. P2-REFUSE-01: Not run P2-REFUSE-01 · Not run · ready
  2. P2-REFUSE-02: Not run P2-REFUSE-02 · Not run · ready
  3. P2-REFUSE-03: Not run P2-REFUSE-03 · Not run · ready

P2-REFUSE-01

Contractor Not run
Do this
Register P2-REFUSE the same way, with harmless sample documents.
Expected
The registration is sent and waits for review.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REFUSE-01 yet.

P2-REFUSE-02 →

P2-REFUSE-02

Staff Not run
Do this
On the live staff portal, refuse P2-REFUSE with a plain-language reason.
Expected
The refusal saves with its reason.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REFUSE-02 yet.

← P2-REFUSE-01 P2-REFUSE-03 →

P2-REFUSE-03

Contractor Not run
Do this
Sign in to the live contractor portal as P2-REFUSE.
Expected
The company shows Not approved with the reason, and cannot start a project.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-REFUSE-03 yet.

← P2-REFUSE-02

Pre-loaded contractor

0 pass · 0 fail · 1 not run.

  1. P2-IMPORT-01: Not run P2-IMPORT-01 · Not run · ready

P2-IMPORT-01

Contractor Not run
Do this
Sign in to the live contractor portal as a contractor pre-loaded from CLEAResult's approved list.
Expected
Sign-in works and the company is already approved. It was not asked to register again.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-IMPORT-01 yet.

Clean up

0 pass · 0 fail · 1 not run.

  1. P2-CLEAN-01: Not run P2-CLEAN-01 · Not run · ready

P2-CLEAN-01

Staff Not run
Do this
Run the documented cleanup for this phase's test accounts, and record the before and after counts.
Expected
Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P2-CLEAN-01 yet.

Before you start

0 pass · 0 fail · 5 not run.

  1. P3-PREP-01: Not run P3-PREP-01 · Not run · ready
  2. P3-PREP-02: Not run P3-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P3-PREP-03: Not run P3-PREP-03 · Not run · unblocked by customer #108, customer #106, please retest
  4. P3-PREP-04: Not run P3-PREP-04 · Not run · ready
  5. P3-PREP-05: Not run P3-PREP-05 · Not run · ready

P3-PREP-01

Staff Not run
Do this
Sign in to the live staff portal with your own account and open Tests.
Expected
Tests opens. Your name shows on the results you record.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-PREP-01 yet.

P3-PREP-02 →

P3-PREP-02

Customer Not run
Do this
Sign in to the live customer portal as this phase's named test building owner.
Expected
You are signed in as the test owner, not as a real customer.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-PREP-02 yet.

← P3-PREP-01 P3-PREP-03 →

P3-PREP-03

Customer Not run
Do this
As the test owner, open a building approved in Phase 1.
Expected
The building shows Approved, with its code and valid-until date.

Unblocked by customer #108, customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-PREP-03 yet.

← P3-PREP-02 P3-PREP-04 →

P3-PREP-04

Contractor Not run
Do this
Sign in to the live contractor portal as your pre-loaded practice contractor. Every tester has one, already approved (contractor #93); Phase 2 is skipped this round, so nobody registers a new company.
Expected
The company shows as approved and can start a project.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-PREP-04 yet.

← P3-PREP-03 P3-PREP-05 →

P3-PREP-05

Staff Not run
Do this
Write the case ID for each test of this phase in its first step's note.
Expected
Every test in this phase has a case ID that names its made-up records.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-PREP-05 yet.

← P3-PREP-04

Customer's code

0 pass · 0 fail · 7 not run.

  1. P3-CODE-01: Not run P3-CODE-01 · Not run · unblocked by customer #108, please retest
  2. P3-CODE-02: Not run P3-CODE-02 · Not run · unblocked by contractor #96, please retest
  3. P3-CODE-03: Not run P3-CODE-03 · Not run · unblocked by contractor #96, please retest
  4. P3-CODE-04: Not run P3-CODE-04 · Not run · unblocked by contractor #96, please retest
  5. P3-CODE-05: Not run P3-CODE-05 · Not run · unblocked by contractor #96, please retest
  6. P3-CODE-06: Not run P3-CODE-06 · Not run · unblocked by contractor #96, customer #96, customer #97, please retest
  7. P3-CODE-07: Not run P3-CODE-07 · Not run · unblocked by customer #96, customer #97, please retest

P3-CODE-01

Customer Not run
Do this
On the approved building, find its building code.
Expected
The code is LEA- or MEA- plus ten digits, with its valid-until date.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-CODE-01 yet.

P3-CODE-02 →

P3-CODE-02

Contractor Not run
Do this
On the live contractor portal, look up a building and type that code.
Expected
That building shows: its name, address and units. No other building or household shows.

Unblocked by contractor #96 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-CODE-02 yet.

← P3-CODE-01 P3-CODE-03 →

P3-CODE-03

Contractor Not run
Do this
Type the same code in lower case and without the dash.
Expected
The same building is found.

Unblocked by contractor #96 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-CODE-03 yet.

← P3-CODE-02 P3-CODE-04 →

P3-CODE-04

Contractor Not run
Do this
Type a made-up code of the same shape.
Expected
The portal says no building has that code. Nothing else shows.

Unblocked by contractor #96 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-CODE-04 yet.

← P3-CODE-03 P3-CODE-05 →

P3-CODE-05

Contractor Not run
Do this
Type an expired code (staff can give you one).
Expected
The portal refuses it and says the code has expired.

Unblocked by contractor #96 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-CODE-05 yet.

← P3-CODE-04 P3-CODE-06 →

P3-CODE-06

Contractor Not run
Do this
Start a multifamily project from the building you found.
Expected
The project is made and linked to that building.

Unblocked by contractor #96, customer #96, customer #97 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-CODE-06 yet.

← P3-CODE-05 P3-CODE-07 →

P3-CODE-07

Customer Not run
Do this
As the test owner, open the building again.
Expected
The contractor's project shows on the building.

Unblocked by customer #96, customer #97 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-CODE-07 yet.

← P3-CODE-06

Contractor's invite link

0 pass · 0 fail · 4 not run.

  1. P3-INVITE-01: Not run P3-INVITE-01 · Not run · unblocked by contractor #96, please retest
  2. P3-INVITE-02: Not run P3-INVITE-02 · Not run · unblocked by contractor #96, customer #96, please retest
  3. P3-INVITE-03: Not run P3-INVITE-03 · Not run · unblocked by customer #96, customer #97, contractor #96, please retest
  4. P3-INVITE-04: Not run P3-INVITE-04 · Not run · unblocked by customer #96, customer #97, please retest

P3-INVITE-01

Contractor Not run
Do this
Start a multifamily project with no building yet.
Expected
The project gets a PRJ- code and says it is waiting for the customer to link it. It cannot be submitted.

Unblocked by contractor #96 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-INVITE-01 yet.

P3-INVITE-02 →

P3-INVITE-02

Contractor Not run
Do this
Email an invite for that project to the test owner's email.
Expected
An invite email arrives with a single-use link.

Unblocked by contractor #96, customer #96 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-INVITE-02 yet.

← P3-INVITE-01 P3-INVITE-03 →

P3-INVITE-03

Customer Not run
Do this
Open the invite link, sign in as the test owner, and link the project to the approved building.
Expected
The project shows on the building. The contractor's project shows as linked.

Unblocked by customer #96, customer #97, contractor #96 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-INVITE-03 yet.

← P3-INVITE-02 P3-INVITE-04 →

P3-INVITE-04

Customer Not run
Do this
Open the same invite link again.
Expected
The portal says the link has already been used.

Unblocked by customer #96, customer #97 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-INVITE-04 yet.

← P3-INVITE-03

Clean up

0 pass · 0 fail · 1 not run.

  1. P3-CLEAN-01: Not run P3-CLEAN-01 · Not run · unblocked by customer #106, please retest

P3-CLEAN-01

Staff Not run
Do this
Run the documented cleanup for this phase's test accounts, and record the before and after counts.
Expected
Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P3-CLEAN-01 yet.

Before you start

0 pass · 0 fail · 7 not run.

  1. P4-HOMES-PREP-01: Not run P4-HOMES-PREP-01 · Not run · ready
  2. P4-HOMES-PREP-02: Not run P4-HOMES-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P4-HOMES-PREP-03: Not run P4-HOMES-PREP-03 · Not run · ready
  4. P4-HOMES-PREP-04: Not run P4-HOMES-PREP-04 · Not run · ready
  5. P4-HOMES-PREP-05: Not run P4-HOMES-PREP-05 · Not run · ready
  6. P4-HOMES-PREP-06: Not run P4-HOMES-PREP-06 · Not run · ready
  7. P4-HOMES-PREP-07: Not run P4-HOMES-PREP-07 · Not run · ready

P4-HOMES-PREP-01

Staff Not run
Do this
Sign in to the live staff portal with your own account and open Tests.
Expected
Tests opens. Your name shows on the results you record.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-PREP-01 yet.

P4-HOMES-PREP-02 →

P4-HOMES-PREP-02

Customer Not run
Do this
Sign in to the live customer portal as this phase's named test building owner.
Expected
You are signed in as the test owner, not as a real customer.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-PREP-02 yet.

← P4-HOMES-PREP-01 P4-HOMES-PREP-03 →

P4-HOMES-PREP-03

Customer Not run
Do this
As the test owner, open the 4-unit building you approved in Phase 1 (the test site has no ready-made practice buildings after #294's clean slate).
Expected
It shows Approved, with its LEA- or MEA- code and expiry date. Write the code down.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-PREP-03 yet.

← P4-HOMES-PREP-02 P4-HOMES-PREP-04 →

P4-HOMES-PREP-04

Customer Not run
Do this
As the test owner, open the 8-unit building you approved in Phase 1. This is the building the BuildingSync tests use.
Expected
It shows Approved, with its own LEA- or MEA- code and expiry date. Write the code down.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-PREP-04 yet.

← P4-HOMES-PREP-03 P4-HOMES-PREP-05 →

P4-HOMES-PREP-05

Contractor Not run
Do this
Sign in to the live contractor portal as your pre-loaded practice contractor. Every tester has one, already approved (contractor #93); Phase 2 is skipped this round, so nobody registers a new company.
Expected
The company shows as approved and can start a project.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-PREP-05 yet.

← P4-HOMES-PREP-04 P4-HOMES-PREP-06 →

P4-HOMES-PREP-06

Staff Not run
Do this
Download the six sample files from this step's Sample file links and keep them together. Never send a practice file to DOE.
Expected
Six files: four HPXML (homes-4unit-…) and two BuildingSync (homes-8unit-…). Each opens as XML.
Sample file
homes-4unit-pass.xml, homes-4unit-fails-rules.xml, homes-4unit-low-savings.xml, homes-4unit-wrong-building.xml, homes-8unit-pass.buildingsync.xml, homes-8unit-fails-rules.buildingsync.xml
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-PREP-06 yet.

← P4-HOMES-PREP-05 P4-HOMES-PREP-07 →

P4-HOMES-PREP-07

Staff Not run
Do this
Write the case ID for each test of this phase in its first step's note.
Expected
Every test in this phase has a case ID that names its made-up records.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-PREP-07 yet.

← P4-HOMES-PREP-06

Approve (HPXML, 4 units)

0 pass · 0 fail · 6 blocked · 6 not run.

  1. P4-HOMES-APPROVE-01: Not run P4-HOMES-APPROVE-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-APPROVE-02: Not run P4-HOMES-APPROVE-02 · Not run · unblocked by contractor #82, please retest
  3. P4-HOMES-APPROVE-03: Not run P4-HOMES-APPROVE-03 · Not run · unblocked by contractor #82, please retest
  4. P4-HOMES-APPROVE-04: Not run P4-HOMES-APPROVE-04 · Not run · unblocked by contractor #82, please retest
  5. P4-HOMES-APPROVE-05: Not run P4-HOMES-APPROVE-05 · Not run · unblocked by contractor #82, please retest
  6. P4-HOMES-APPROVE-06: Blocked P4-HOMES-APPROVE-06 · Blocked by customer #150
  7. P4-HOMES-APPROVE-07: Blocked P4-HOMES-APPROVE-07 · Blocked by staff #283
  8. P4-HOMES-APPROVE-08: Blocked P4-HOMES-APPROVE-08 · Blocked by staff #283
  9. P4-HOMES-APPROVE-09: Blocked P4-HOMES-APPROVE-09 · Blocked by staff #283
  10. P4-HOMES-APPROVE-10: Blocked P4-HOMES-APPROVE-10 · Blocked by staff #283
  11. P4-HOMES-APPROVE-11: Not run P4-HOMES-APPROVE-11 · Not run · unblocked by contractor #82, please retest
  12. P4-HOMES-APPROVE-12: Blocked P4-HOMES-APPROVE-12 · Blocked by staff #283

P4-HOMES-APPROVE-01

Contractor Not run
Do this
Choose + Start a project, type the 4-unit building's code, and choose a HOMES project.
Expected
The project opens on that building. The steps read 1 Confirm the building, 2 Upload the assessment, 3 Review and send.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-01 yet.

P4-HOMES-APPROVE-02 →

P4-HOMES-APPROVE-02

Contractor Not run
Do this
In 1 · Confirm the building, check the property name, address and units, tick This is the building I assessed, and confirm.
Expected
The building shows 4 units and its code. The page moves on to 2 · Upload the assessment.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-02 yet.

← P4-HOMES-APPROVE-01 P4-HOMES-APPROVE-03 →

P4-HOMES-APPROVE-03

Contractor Not run
Do this
In 2 · Upload the assessment, upload homes-4unit-pass.xml. Never send a practice file to DOE.
Expected
The file is accepted and checked against DOE's rules. It passes.
Sample file
homes-4unit-pass.xml

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-03 yet.

← P4-HOMES-APPROVE-02 P4-HOMES-APPROVE-04 →

P4-HOMES-APPROVE-04

Contractor Not run
Do this
Open 3 · Review and send and read what was taken from the file.
Expected
Units 4, conditioned floor area 3600 sq ft, year built 1950, modeled savings 25 %, total project cost $50,000.00, eligible upgrade cost $48,000.00. You typed none of them.
Sample file
homes-4unit-pass.xml

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-04 yet.

← P4-HOMES-APPROVE-03 P4-HOMES-APPROVE-05 →

P4-HOMES-APPROVE-05

Contractor Not run
Do this
Tick HOMES reservation, tick I've reviewed the imported details, and choose Send to the program.
Expected
A receipt shows the reservation as Received for staff review. It says a receipt is not an approval.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-05 yet.

← P4-HOMES-APPROVE-04 P4-HOMES-APPROVE-06 →

P4-HOMES-APPROVE-06

Customer Blocked
Do this
As the test owner, read and sign the contractor's proposal for this project.
Expected
Your signature is recorded with the date. The contractor sees it signed.

Blocked by customer #150.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-06 yet.

← P4-HOMES-APPROVE-05 P4-HOMES-APPROVE-07 →

P4-HOMES-APPROVE-07

Staff Blocked
Do this
On the live staff portal, open Applications, then Contractor HOMES and HEAR requests, and open this HOMES reservation.
Expected
It shows the 4-unit building, the assessment file, DOE validation, the facts read from the file, and no Items to resolve before approval.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-07 yet.

← P4-HOMES-APPROVE-06 P4-HOMES-APPROVE-08 →

P4-HOMES-APPROVE-08

Staff Blocked
Do this
Open the energy model file and choose Check against DOE rules.
Expected
Passed, with 0 required problems. The result is on the application's timeline with your name.
Sample file
homes-4unit-pass.xml

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-08 yet.

← P4-HOMES-APPROVE-07 P4-HOMES-APPROVE-09 →

P4-HOMES-APPROVE-09

Staff Blocked
Do this
Check the rebate shown for this reservation.
Expected
25% savings is in the 20–34% band, so 4 units give $20,000 on an LEA- building or $8,000 on an MEA- building (contractor #82's table).

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-09 yet.

← P4-HOMES-APPROVE-08 P4-HOMES-APPROVE-10 →

P4-HOMES-APPROVE-10

Staff Blocked
Do this
Work the reservation review tick list and approve.
Expected
The approval saves and the offer letter is recorded.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-10 yet.

← P4-HOMES-APPROVE-09 P4-HOMES-APPROVE-11 →

P4-HOMES-APPROVE-11

Customer Not run
Do this
As the test owner, open the building's project. No email is sent today, so check the page.
Expected
The status shows Reserved / Project Approved.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-11 yet.

← P4-HOMES-APPROVE-10 P4-HOMES-APPROVE-12 →

P4-HOMES-APPROVE-12

Contractor Blocked
Do this
Open the project on the contractor portal.
Expected
3 · Review and send shows the HOMES reservation as Approved.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-12 yet.

← P4-HOMES-APPROVE-11

Approve (BuildingSync, 8 units)

0 pass · 0 fail · 7 blocked · 0 not run.

  1. P4-HOMES-APPROVE-BS-01: Blocked P4-HOMES-APPROVE-BS-01 · Blocked by contractor #122
  2. P4-HOMES-APPROVE-BS-02: Blocked P4-HOMES-APPROVE-BS-02 · Blocked by contractor #122
  3. P4-HOMES-APPROVE-BS-03: Blocked P4-HOMES-APPROVE-BS-03 · Blocked by contractor #122
  4. P4-HOMES-APPROVE-BS-04: Blocked P4-HOMES-APPROVE-BS-04 · Blocked by staff #283
  5. P4-HOMES-APPROVE-BS-05: Blocked P4-HOMES-APPROVE-BS-05 · Blocked by staff #283
  6. P4-HOMES-APPROVE-BS-06: Blocked P4-HOMES-APPROVE-BS-06 · Blocked by staff #283
  7. P4-HOMES-APPROVE-BS-07: Blocked P4-HOMES-APPROVE-BS-07 · Blocked by contractor #122

P4-HOMES-APPROVE-BS-01

Contractor Blocked
Do this
Start a HOMES project with the 8-unit building's code, and confirm the building in 1 · Confirm the building.
Expected
The building shows 8 units and its own code.

Blocked by contractor #122.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-BS-01 yet.

P4-HOMES-APPROVE-BS-02 →

P4-HOMES-APPROVE-BS-02

Contractor Blocked
Do this
In 2 · Upload the assessment, upload homes-8unit-pass.buildingsync.xml. Buildings of 5 or more units report with BuildingSync. Never send a practice file to DOE.
Expected
The file is accepted as BuildingSync and passes DOE's rules. Address, 8 units, floor area 7,200 sq ft, year built 1990 and savings 36% are read from it.
Sample file
homes-8unit-pass.buildingsync.xml

Blocked by contractor #122.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-BS-02 yet.

← P4-HOMES-APPROVE-BS-01 P4-HOMES-APPROVE-BS-03 →

P4-HOMES-APPROVE-BS-03

Contractor Blocked
Do this
Tick HOMES reservation and the review box, and choose Send to the program.
Expected
A receipt shows the reservation as Received for staff review.

Blocked by contractor #122.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-BS-03 yet.

← P4-HOMES-APPROVE-BS-02 P4-HOMES-APPROVE-BS-04 →

P4-HOMES-APPROVE-BS-04

Staff Blocked
Do this
On the live staff portal, open this HOMES reservation's assessment file and choose Check against DOE rules.
Expected
Passed, as BuildingSync, with 0 required problems.
Sample file
homes-8unit-pass.buildingsync.xml

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-BS-04 yet.

← P4-HOMES-APPROVE-BS-03 P4-HOMES-APPROVE-BS-05 →

P4-HOMES-APPROVE-BS-05

Staff Blocked
Do this
Check the rebate shown for this reservation.
Expected
36% savings is in the 35%+ band, so 8 units give $80,000 on an LEA- building or $32,000 on an MEA- building.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-BS-05 yet.

← P4-HOMES-APPROVE-BS-04 P4-HOMES-APPROVE-BS-06 →

P4-HOMES-APPROVE-BS-06

Staff Blocked
Do this
Work the reservation review tick list and approve.
Expected
The approval saves and the offer letter is recorded.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-BS-06 yet.

← P4-HOMES-APPROVE-BS-05 P4-HOMES-APPROVE-BS-07 →

P4-HOMES-APPROVE-BS-07

Customer Blocked
Do this
As the test owner, open the 8-unit building's project.
Expected
The status shows Reserved / Project Approved.

Blocked by contractor #122.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-APPROVE-BS-07 yet.

← P4-HOMES-APPROVE-BS-06

Mismatch, explained

0 pass · 0 fail · 2 blocked · 3 not run.

  1. P4-HOMES-MISMATCH-01: Not run P4-HOMES-MISMATCH-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-MISMATCH-02: Not run P4-HOMES-MISMATCH-02 · Not run · unblocked by contractor #82, please retest
  3. P4-HOMES-MISMATCH-03: Not run P4-HOMES-MISMATCH-03 · Not run · unblocked by contractor #82, please retest
  4. P4-HOMES-MISMATCH-04: Blocked P4-HOMES-MISMATCH-04 · Blocked by staff #283
  5. P4-HOMES-MISMATCH-05: Blocked P4-HOMES-MISMATCH-05 · Blocked by staff #283

P4-HOMES-MISMATCH-01

Contractor Not run
Do this
Start a HOMES project with the 4-unit building's code, confirm the building, and upload homes-4unit-wrong-building.xml. Never send a practice file to DOE.
Expected
The file passes DOE's rules. Nothing stops you going on to 3 · Review and send.
Sample file
homes-4unit-wrong-building.xml

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-MISMATCH-01 yet.

P4-HOMES-MISMATCH-02 →

P4-HOMES-MISMATCH-02

Contractor Not run
Do this
Read Items for staff to review in 3 · Review and send.
Expected
It says: Unit count differs: the customer has 4; the file has 12. It also says the items won't stop you sending.
Sample file
homes-4unit-wrong-building.xml

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-MISMATCH-02 yet.

← P4-HOMES-MISMATCH-01 P4-HOMES-MISMATCH-03 →

P4-HOMES-MISMATCH-03

Contractor Not run
Do this
Write the explanation "The model covers the whole 12-unit complex; this building is 4 of them" and send the HOMES reservation.
Expected
Send needs the explanation. With it, a receipt shows Received for staff review.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-MISMATCH-03 yet.

← P4-HOMES-MISMATCH-02 P4-HOMES-MISMATCH-04 →

P4-HOMES-MISMATCH-04

Staff Blocked
Do this
On the live staff portal, open Applications, then Contractor HOMES and HEAR requests, and open this HOMES reservation.
Expected
The flagged unit-count difference and the contractor's explanation show together.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-MISMATCH-04 yet.

← P4-HOMES-MISMATCH-03 P4-HOMES-MISMATCH-05 →

P4-HOMES-MISMATCH-05

Staff Blocked
Do this
Accept the explanation, work the tick list and approve.
Expected
The approval saves with the explanation kept on the record.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-MISMATCH-05 yet.

← P4-HOMES-MISMATCH-04

Send back (failing file)

0 pass · 0 fail · 4 blocked · 3 not run.

  1. P4-HOMES-CORRECT-01: Not run P4-HOMES-CORRECT-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-CORRECT-02: Not run P4-HOMES-CORRECT-02 · Not run · unblocked by contractor #82, please retest
  3. P4-HOMES-CORRECT-03: Blocked P4-HOMES-CORRECT-03 · Blocked by staff #283
  4. P4-HOMES-CORRECT-04: Blocked P4-HOMES-CORRECT-04 · Blocked by staff #283
  5. P4-HOMES-CORRECT-05: Blocked P4-HOMES-CORRECT-05 · Blocked by staff #283
  6. P4-HOMES-CORRECT-06: Not run P4-HOMES-CORRECT-06 · Not run · unblocked by contractor #82, please retest
  7. P4-HOMES-CORRECT-07: Blocked P4-HOMES-CORRECT-07 · Blocked by staff #283

P4-HOMES-CORRECT-01

Contractor Not run
Do this
Start a HOMES project with the 4-unit building's code, confirm the building, and upload homes-4unit-fails-rules.xml. Never send a practice file to DOE.
Expected
The file reads as HPXML version 4. Items for staff to review list DOE rebate requirements it misses: Expected YearBuilt.
Sample file
homes-4unit-fails-rules.xml

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-01 yet.

P4-HOMES-CORRECT-02 →

P4-HOMES-CORRECT-02

Contractor Not run
Do this
Explain "Year built not in our export yet" and send the HOMES reservation.
Expected
A receipt shows Received for staff review.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-02 yet.

← P4-HOMES-CORRECT-01 P4-HOMES-CORRECT-03 →

P4-HOMES-CORRECT-03

Staff Blocked
Do this
On the live staff portal, open the file and choose Check against DOE rules.
Expected
Failed · 2 problems, each Expected YearBuilt. Approve is off, and says why.
Sample file
homes-4unit-fails-rules.xml

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-03 yet.

← P4-HOMES-CORRECT-02 P4-HOMES-CORRECT-04 →

P4-HOMES-CORRECT-04

Staff Blocked
Do this
Set Review state to Ask contractor for information, paste the problem list as the note, and save.
Expected
The note saves. The request reads Needs information.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-04 yet.

← P4-HOMES-CORRECT-03 P4-HOMES-CORRECT-05 →

P4-HOMES-CORRECT-05

Contractor Blocked
Do this
Open the project on the contractor portal.
Expected
The HOMES reservation shows More information needed, with staff's list.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-05 yet.

← P4-HOMES-CORRECT-04 P4-HOMES-CORRECT-06 →

P4-HOMES-CORRECT-06

Contractor Not run
Do this
Upload homes-4unit-pass.xml in 2 · Upload the assessment and send the HOMES reservation again. Never send a practice file to DOE.
Expected
It shows as updated information, Received for staff review.
Sample file
homes-4unit-pass.xml

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-06 yet.

← P4-HOMES-CORRECT-05 P4-HOMES-CORRECT-07 →

P4-HOMES-CORRECT-07

Staff Blocked
Do this
Open the new file and choose Check against DOE rules.
Expected
Passed, with 0 required problems. Approve turns on.
Sample file
homes-4unit-pass.xml

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-07 yet.

← P4-HOMES-CORRECT-06

Send back (BuildingSync)

0 pass · 0 fail · 5 blocked · 0 not run.

  1. P4-HOMES-CORRECT-BS-01: Blocked P4-HOMES-CORRECT-BS-01 · Blocked by contractor #122
  2. P4-HOMES-CORRECT-BS-02: Blocked P4-HOMES-CORRECT-BS-02 · Blocked by staff #283
  3. P4-HOMES-CORRECT-BS-03: Blocked P4-HOMES-CORRECT-BS-03 · Blocked by staff #283
  4. P4-HOMES-CORRECT-BS-04: Blocked P4-HOMES-CORRECT-BS-04 · Blocked by contractor #122
  5. P4-HOMES-CORRECT-BS-05: Blocked P4-HOMES-CORRECT-BS-05 · Blocked by staff #283

P4-HOMES-CORRECT-BS-01

Contractor Blocked
Do this
Start a HOMES project with the 8-unit building's code, confirm the building, upload homes-8unit-fails-rules.buildingsync.xml and send the HOMES reservation. Never send a practice file to DOE.
Expected
A receipt shows Received for staff review.
Sample file
homes-8unit-fails-rules.buildingsync.xml

Blocked by contractor #122.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-BS-01 yet.

P4-HOMES-CORRECT-BS-02 →

P4-HOMES-CORRECT-BS-02

Staff Blocked
Do this
On the live staff portal, open the file and choose Check against DOE rules.
Expected
Failed · 1 problem: element "auc:YearOfConstruction" is REQUIRED. Approve is off.
Sample file
homes-8unit-fails-rules.buildingsync.xml

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-BS-02 yet.

← P4-HOMES-CORRECT-BS-01 P4-HOMES-CORRECT-BS-03 →

P4-HOMES-CORRECT-BS-03

Staff Blocked
Do this
Set Review state to Ask contractor for information, paste the problem list as the note, and save.
Expected
The note saves. The request reads Needs information.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-BS-03 yet.

← P4-HOMES-CORRECT-BS-02 P4-HOMES-CORRECT-BS-04 →

P4-HOMES-CORRECT-BS-04

Contractor Blocked
Do this
Upload homes-8unit-pass.buildingsync.xml and send the HOMES reservation again. Never send a practice file to DOE.
Expected
It shows as updated information, Received for staff review.
Sample file
homes-8unit-pass.buildingsync.xml

Blocked by contractor #122.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-BS-04 yet.

← P4-HOMES-CORRECT-BS-03 P4-HOMES-CORRECT-BS-05 →

P4-HOMES-CORRECT-BS-05

Staff Blocked
Do this
Check the new file against DOE rules.
Expected
Passed, as BuildingSync. Approve turns on.
Sample file
homes-8unit-pass.buildingsync.xml

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CORRECT-BS-05 yet.

← P4-HOMES-CORRECT-BS-04

Deny: savings too low

0 pass · 0 fail · 3 blocked · 4 not run.

  1. P4-HOMES-DENY-LOW-01: Not run P4-HOMES-DENY-LOW-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-DENY-LOW-02: Not run P4-HOMES-DENY-LOW-02 · Not run · unblocked by contractor #82, please retest
  3. P4-HOMES-DENY-LOW-03: Not run P4-HOMES-DENY-LOW-03 · Not run · unblocked by contractor #82, please retest
  4. P4-HOMES-DENY-LOW-04: Blocked P4-HOMES-DENY-LOW-04 · Blocked by staff #283
  5. P4-HOMES-DENY-LOW-05: Blocked P4-HOMES-DENY-LOW-05 · Blocked by staff #283
  6. P4-HOMES-DENY-LOW-06: Blocked P4-HOMES-DENY-LOW-06 · Blocked by staff #283
  7. P4-HOMES-DENY-LOW-07: Not run P4-HOMES-DENY-LOW-07 · Not run · unblocked by contractor #82, please retest

P4-HOMES-DENY-LOW-01

Contractor Not run
Do this
Start a HOMES project with the 4-unit building's code, confirm the building, and upload homes-4unit-low-savings.xml. Never send a practice file to DOE.
Expected
The file passes DOE's rules. Modeled savings reads 19.4 %.
Sample file
homes-4unit-low-savings.xml

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-LOW-01 yet.

P4-HOMES-DENY-LOW-02 →

P4-HOMES-DENY-LOW-02

Contractor Not run
Do this
Read Items for staff to review.
Expected
It says the file's modeled savings are below the HOMES threshold (20%; 19.5% rounds up). Sending is not blocked.
Sample file
homes-4unit-low-savings.xml

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-LOW-02 yet.

← P4-HOMES-DENY-LOW-01 P4-HOMES-DENY-LOW-03 →

P4-HOMES-DENY-LOW-03

Contractor Not run
Do this
Explain "Owner may add wall insulation later" and send the HOMES reservation.
Expected
A receipt shows Received for staff review.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-LOW-03 yet.

← P4-HOMES-DENY-LOW-02 P4-HOMES-DENY-LOW-04 →

P4-HOMES-DENY-LOW-04

Staff Blocked
Do this
On the live staff portal, open Applications, then Contractor HOMES and HEAR requests, and open this HOMES reservation.
Expected
The 19.4% savings is flagged, with the contractor's explanation.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-LOW-04 yet.

← P4-HOMES-DENY-LOW-03 P4-HOMES-DENY-LOW-05 →

P4-HOMES-DENY-LOW-05

Staff Blocked
Do this
Deny the reservation with the reason "Savings below 20%".
Expected
The denial saves with its reason.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-LOW-05 yet.

← P4-HOMES-DENY-LOW-04 P4-HOMES-DENY-LOW-06 →

P4-HOMES-DENY-LOW-06

Contractor Blocked
Do this
Open the project on the contractor portal.
Expected
The HOMES reservation shows Not approved and the reason.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-LOW-06 yet.

← P4-HOMES-DENY-LOW-05 P4-HOMES-DENY-LOW-07 →

P4-HOMES-DENY-LOW-07

Customer Not run
Do this
As the test owner, open the building's project.
Expected
It shows Not approved and the reason, in plain words.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-LOW-07 yet.

← P4-HOMES-DENY-LOW-06

Deny: wrong building

0 pass · 0 fail · 3 blocked · 3 not run.

  1. P4-HOMES-DENY-BLDG-01: Not run P4-HOMES-DENY-BLDG-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-DENY-BLDG-02: Not run P4-HOMES-DENY-BLDG-02 · Not run · unblocked by contractor #82, please retest
  3. P4-HOMES-DENY-BLDG-03: Blocked P4-HOMES-DENY-BLDG-03 · Blocked by staff #283
  4. P4-HOMES-DENY-BLDG-04: Blocked P4-HOMES-DENY-BLDG-04 · Blocked by staff #283
  5. P4-HOMES-DENY-BLDG-05: Blocked P4-HOMES-DENY-BLDG-05 · Blocked by staff #283
  6. P4-HOMES-DENY-BLDG-06: Not run P4-HOMES-DENY-BLDG-06 · Not run · unblocked by contractor #82, please retest

P4-HOMES-DENY-BLDG-01

Contractor Not run
Do this
Start a HOMES project with the 4-unit building's code, confirm the building, and upload homes-4unit-wrong-building.xml. Never send a practice file to DOE.
Expected
Items for staff to review says: Unit count differs: the customer has 4; the file has 12.
Sample file
homes-4unit-wrong-building.xml

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-BLDG-01 yet.

P4-HOMES-DENY-BLDG-02 →

P4-HOMES-DENY-BLDG-02

Contractor Not run
Do this
Explain "File is for the neighboring building" and send the HOMES reservation.
Expected
A receipt shows Received for staff review.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-BLDG-02 yet.

← P4-HOMES-DENY-BLDG-01 P4-HOMES-DENY-BLDG-03 →

P4-HOMES-DENY-BLDG-03

Staff Blocked
Do this
On the live staff portal, open Applications, then Contractor HOMES and HEAR requests, and open this HOMES reservation.
Expected
The unit-count difference and the explanation show together.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-BLDG-03 yet.

← P4-HOMES-DENY-BLDG-02 P4-HOMES-DENY-BLDG-04 →

P4-HOMES-DENY-BLDG-04

Staff Blocked
Do this
Deny the reservation with the reason "Energy model is for a different building".
Expected
The denial saves with its reason.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-BLDG-04 yet.

← P4-HOMES-DENY-BLDG-03 P4-HOMES-DENY-BLDG-05 →

P4-HOMES-DENY-BLDG-05

Contractor Blocked
Do this
Open the project on the contractor portal.
Expected
The HOMES reservation shows Not approved and the reason.

Blocked by staff #283.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-BLDG-05 yet.

← P4-HOMES-DENY-BLDG-04 P4-HOMES-DENY-BLDG-06 →

P4-HOMES-DENY-BLDG-06

Customer Not run
Do this
As the test owner, open the building's project.
Expected
It shows Not approved and the reason, in plain words.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-DENY-BLDG-06 yet.

← P4-HOMES-DENY-BLDG-05

Customer's view

0 pass · 0 fail · 2 blocked · 1 not run.

  1. P4-HOMES-OWNER-01: Not run P4-HOMES-OWNER-01 · Not run · unblocked by contractor #82, please retest
  2. P4-HOMES-OWNER-02: Blocked P4-HOMES-OWNER-02 · Blocked by customer #113
  3. P4-HOMES-OWNER-03: Blocked P4-HOMES-OWNER-03 · Blocked by customer #113

P4-HOMES-OWNER-01

Customer Not run
Do this
As the test owner, open the project approved in P4-HOMES-APPROVE.
Expected
Its status history shows each change: sent to the program, then approved.

Unblocked by contractor #82 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-OWNER-01 yet.

P4-HOMES-OWNER-02 →

P4-HOMES-OWNER-02

Customer Blocked
Do this
Open the project's documents.
Expected
The proposal you signed is there, with the date you signed it.

Blocked by customer #113.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-OWNER-02 yet.

← P4-HOMES-OWNER-01 P4-HOMES-OWNER-03 →

P4-HOMES-OWNER-03

Customer Blocked
Do this
Look for the energy model file's contents and staff's review tick list.
Expected
Neither is shown to you. You see the status and your own documents only.

Blocked by customer #113.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-OWNER-03 yet.

← P4-HOMES-OWNER-02

Clean up

0 pass · 0 fail · 1 not run.

  1. P4-HOMES-CLEAN-01: Not run P4-HOMES-CLEAN-01 · Not run · unblocked by customer #106, please retest

P4-HOMES-CLEAN-01

Staff Not run
Do this
Run the documented cleanup for this phase's practice records (customer portal docs/practice-customers.md, Teardown), and record the before and after counts.
Expected
Every record this phase made is removed or labeled Test, including the 8-unit practice buildings. Staff lists and exports no longer show it as real.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4-HOMES-CLEAN-01 yet.

Before you start

0 pass · 0 fail · 6 not run.

  1. P4_1-HEAR-PREP-01: Not run P4_1-HEAR-PREP-01 · Not run · ready
  2. P4_1-HEAR-PREP-02: Not run P4_1-HEAR-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P4_1-HEAR-PREP-03: Not run P4_1-HEAR-PREP-03 · Not run · ready
  4. P4_1-HEAR-PREP-04: Not run P4_1-HEAR-PREP-04 · Not run · ready
  5. P4_1-HEAR-PREP-05: Not run P4_1-HEAR-PREP-05 · Not run · ready
  6. P4_1-HEAR-PREP-06: Not run P4_1-HEAR-PREP-06 · Not run · ready

P4_1-HEAR-PREP-01

Staff Not run
Do this
Sign in to the live staff portal with your own account and open Tests.
Expected
Tests opens. Your name shows on the results you record.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-PREP-01 yet.

P4_1-HEAR-PREP-02 →

P4_1-HEAR-PREP-02

Customer Not run
Do this
Sign in to the live customer portal as this phase's named test building owner.
Expected
You are signed in as the test owner, not as a real customer.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-PREP-02 yet.

← P4_1-HEAR-PREP-01 P4_1-HEAR-PREP-03 →

P4_1-HEAR-PREP-03

Customer Not run
Do this
As the test owner, open the 4-unit building you approved in Phase 1.
Expected
It shows Approved, with its LEA- or MEA- code and expiry date. Write the code down.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-PREP-03 yet.

← P4_1-HEAR-PREP-02 P4_1-HEAR-PREP-04 →

P4_1-HEAR-PREP-04

Contractor Not run
Do this
Sign in to the live contractor portal as your pre-loaded practice contractor. Every tester has one, already approved (contractor #93); Phase 2 is skipped this round, so nobody registers a new company.
Expected
The company shows as approved and can start a project.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-PREP-04 yet.

← P4_1-HEAR-PREP-03 P4_1-HEAR-PREP-05 →

P4_1-HEAR-PREP-05

Staff Not run
Do this
Download practice-document.pdf from this step's Sample file link. It is the file for every paperwork upload in this phase. Never send a practice file to DOE.
Expected
A one-page PDF that says PRACTICE FILE - NOT A REAL DOCUMENT.
Sample file
practice-document.pdf
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-PREP-05 yet.

← P4_1-HEAR-PREP-04 P4_1-HEAR-PREP-06 →

P4_1-HEAR-PREP-06

Staff Not run
Do this
Write the case ID for each test of this phase in its first step's note.
Expected
Every test in this phase has a case ID that names its made-up records.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-PREP-06 yet.

← P4_1-HEAR-PREP-05

Approve

0 pass · 0 fail · 10 blocked · 0 not run.

  1. P4_1-HEAR-APPROVE-01: Blocked P4_1-HEAR-APPROVE-01 · Blocked by contractor #133
  2. P4_1-HEAR-APPROVE-02: Blocked P4_1-HEAR-APPROVE-02 · Blocked by contractor #133
  3. P4_1-HEAR-APPROVE-03: Blocked P4_1-HEAR-APPROVE-03 · Blocked by contractor #133
  4. P4_1-HEAR-APPROVE-04: Blocked P4_1-HEAR-APPROVE-04 · Blocked by contractor #133
  5. P4_1-HEAR-APPROVE-05: Blocked P4_1-HEAR-APPROVE-05 · Blocked by contractor #133
  6. P4_1-HEAR-APPROVE-06: Blocked P4_1-HEAR-APPROVE-06 · Blocked by staff #320
  7. P4_1-HEAR-APPROVE-07: Blocked P4_1-HEAR-APPROVE-07 · Blocked by staff #320
  8. P4_1-HEAR-APPROVE-08: Blocked P4_1-HEAR-APPROVE-08 · Blocked by staff #320
  9. P4_1-HEAR-APPROVE-09: Blocked P4_1-HEAR-APPROVE-09 · Blocked by contractor #133
  10. P4_1-HEAR-APPROVE-10: Blocked P4_1-HEAR-APPROVE-10 · Blocked by customer #166

P4_1-HEAR-APPROVE-01

Contractor Blocked
Do this
Choose + Start a project, type the 4-unit building's code, and choose a HEAR project.
Expected
The project opens on that building. The steps read 1 Property and buildings through 7 Send to the program; 8 Work finished and payment is locked until the program approves.

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-APPROVE-01 yet.

P4_1-HEAR-APPROVE-02 →

P4_1-HEAR-APPROVE-02

Contractor Blocked
Do this
Fill in 1 Property and buildings, 2 Units and floor plans, 3 Equipment (add one heat pump) and 4 What goes in each unit.
Expected
Each of the four sections shows as done, and the project shows its cost and rebate.

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-APPROVE-02 yet.

← P4_1-HEAR-APPROVE-01 P4_1-HEAR-APPROVE-03 →

P4_1-HEAR-APPROVE-03

Contractor Blocked
Do this
In 5 Paperwork, upload practice-document.pdf for every item it asks for.
Expected
Each upload is listed with its name.
Sample file
practice-document.pdf

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-APPROVE-03 yet.

← P4_1-HEAR-APPROVE-02 P4_1-HEAR-APPROVE-04 →

P4_1-HEAR-APPROVE-04

Contractor Blocked
Do this
In 6 Proposal and the owner's forms, share the proposal with the owner.
Expected
The proposal shows as shared, version 1. The owner's before-work forms are listed.

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-APPROVE-04 yet.

← P4_1-HEAR-APPROVE-03 P4_1-HEAR-APPROVE-05 →

P4_1-HEAR-APPROVE-05

Contractor Blocked
Do this
In 7 Send to the program, choose Send to the program.
Expected
A receipt ending HEAR-RESERVATION-1 shows the reservation as Received for staff review.

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-APPROVE-05 yet.

← P4_1-HEAR-APPROVE-04 P4_1-HEAR-APPROVE-06 →

P4_1-HEAR-APPROVE-06

Staff Blocked
Do this
On the live staff portal, open Applications, then Contractor HOMES and HEAR requests, and open this HEAR reservation.
Expected
Reservation review shows Contractor HEAR request, below the attachments: the building, units, equipment, project cost, rebate requested, the paperwork files, and the owner's forms marked Not recorded yet.

Blocked by staff #320.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-APPROVE-06 yet.

← P4_1-HEAR-APPROVE-05 P4_1-HEAR-APPROVE-07 →

P4_1-HEAR-APPROVE-07

Staff Blocked
Do this
Open each paperwork file listed on the request.
Expected
Each one downloads and is the practice PDF.
Sample file
practice-document.pdf

Blocked by staff #320.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-APPROVE-07 yet.

← P4_1-HEAR-APPROVE-06 P4_1-HEAR-APPROVE-08 →

P4_1-HEAR-APPROVE-08

Staff Blocked
Do this
Set Review state to Approved. Type the rebate requested shown on the card as the rebate amount, and the last day of the month a year from today as the offer expiry. Write a note and save.
Expected
The request reads Approved, with the approved rebate and offer expiry under it.

Blocked by staff #320.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-APPROVE-08 yet.

← P4_1-HEAR-APPROVE-07 P4_1-HEAR-APPROVE-09 →

P4_1-HEAR-APPROVE-09

Contractor Blocked
Do this
Open the project on the contractor portal.
Expected
7 Send to the program shows Approved. 8 Work finished and payment is open and names the approved rebate.

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-APPROVE-09 yet.

← P4_1-HEAR-APPROVE-08 P4_1-HEAR-APPROVE-10 →

P4_1-HEAR-APPROVE-10

Customer Blocked
Do this
As the test owner, open the building's project.
Expected
It shows the HEAR reservation as approved.

Blocked by customer #166.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-APPROVE-10 yet.

← P4_1-HEAR-APPROVE-09

Deny

0 pass · 0 fail · 4 blocked · 0 not run.

  1. P4_1-HEAR-DENY-01: Blocked P4_1-HEAR-DENY-01 · Blocked by contractor #133
  2. P4_1-HEAR-DENY-02: Blocked P4_1-HEAR-DENY-02 · Blocked by staff #320
  3. P4_1-HEAR-DENY-03: Blocked P4_1-HEAR-DENY-03 · Blocked by contractor #133
  4. P4_1-HEAR-DENY-04: Blocked P4_1-HEAR-DENY-04 · Blocked by customer #166

P4_1-HEAR-DENY-01

Contractor Blocked
Do this
Start another HEAR project with the 4-unit building's code, fill in sections 1 to 6 as in Approve, and choose Send to the program.
Expected
A receipt shows the reservation as Received for staff review.
Sample file
practice-document.pdf

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-DENY-01 yet.

P4_1-HEAR-DENY-02 →

P4_1-HEAR-DENY-02

Staff Blocked
Do this
On the live staff portal, open this HEAR reservation. Set Review state to Denied with the note "Practice denial: equipment not on the eligible list" and save.
Expected
The request reads Denied, with the note as the decision note. No review form is left on it.

Blocked by staff #320.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-DENY-02 yet.

← P4_1-HEAR-DENY-01 P4_1-HEAR-DENY-03 →

P4_1-HEAR-DENY-03

Contractor Blocked
Do this
Open the project on the contractor portal.
Expected
7 Send to the program shows Denied and the reason. Send again is offered.

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-DENY-03 yet.

← P4_1-HEAR-DENY-02 P4_1-HEAR-DENY-04 →

P4_1-HEAR-DENY-04

Customer Blocked
Do this
As the test owner, open the building's project.
Expected
It shows Not approved and the reason, in plain words.

Blocked by customer #166.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-DENY-04 yet.

← P4_1-HEAR-DENY-03

Send back

0 pass · 0 fail · 5 blocked · 0 not run.

  1. P4_1-HEAR-CORRECT-01: Blocked P4_1-HEAR-CORRECT-01 · Blocked by contractor #133
  2. P4_1-HEAR-CORRECT-02: Blocked P4_1-HEAR-CORRECT-02 · Blocked by staff #320
  3. P4_1-HEAR-CORRECT-03: Blocked P4_1-HEAR-CORRECT-03 · Blocked by contractor #133
  4. P4_1-HEAR-CORRECT-04: Blocked P4_1-HEAR-CORRECT-04 · Blocked by contractor #133
  5. P4_1-HEAR-CORRECT-05: Blocked P4_1-HEAR-CORRECT-05 · Blocked by staff #320

P4_1-HEAR-CORRECT-01

Contractor Blocked
Do this
Start another HEAR project with the 4-unit building's code, fill in sections 1 to 6, and choose Send to the program.
Expected
A receipt shows the reservation as Received for staff review.
Sample file
practice-document.pdf

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-CORRECT-01 yet.

P4_1-HEAR-CORRECT-02 →

P4_1-HEAR-CORRECT-02

Staff Blocked
Do this
On the live staff portal, open this HEAR reservation. Set Review state to Ask contractor for information with the note "Please add the floor plan for unit 2" and save.
Expected
The note saves. The request reads More information needed.

Blocked by staff #320.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-CORRECT-02 yet.

← P4_1-HEAR-CORRECT-01 P4_1-HEAR-CORRECT-03 →

P4_1-HEAR-CORRECT-03

Contractor Blocked
Do this
Open the project on the contractor portal.
Expected
7 Send to the program shows More information needed, with staff's note. Send again is offered.

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-CORRECT-03 yet.

← P4_1-HEAR-CORRECT-02 P4_1-HEAR-CORRECT-04 →

P4_1-HEAR-CORRECT-04

Contractor Blocked
Do this
In 5 Paperwork, upload practice-document.pdf once more, then choose Send again in 7 Send to the program.
Expected
A receipt ending HEAR-RESERVATION-2 shows the reservation as Received for staff review.
Sample file
practice-document.pdf

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-CORRECT-04 yet.

← P4_1-HEAR-CORRECT-03 P4_1-HEAR-CORRECT-05 →

P4_1-HEAR-CORRECT-05

Staff Blocked
Do this
On the live staff portal, open this HEAR reservation again.
Expected
It shows the new receipt, Received, the extra paperwork file, and the review form again.

Blocked by staff #320.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-CORRECT-05 yet.

← P4_1-HEAR-CORRECT-04

Clean up

0 pass · 0 fail · 1 not run.

  1. P4_1-HEAR-CLEAN-01: Not run P4_1-HEAR-CLEAN-01 · Not run · unblocked by customer #106, please retest

P4_1-HEAR-CLEAN-01

Staff Not run
Do this
Run the documented cleanup for this phase's practice records (customer portal docs/practice-customers.md, Teardown), and record the before and after counts.
Expected
Every record this phase made is removed or labeled Test, including the three HEAR projects. Staff lists and exports no longer show it as real.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P4_1-HEAR-CLEAN-01 yet.

Before you start

0 pass · 0 fail · 5 not run.

  1. P5-PREP-01: Not run P5-PREP-01 · Not run · ready
  2. P5-PREP-02: Not run P5-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P5-PREP-03: Not run P5-PREP-03 · Not run · ready
  4. P5-PREP-04: Not run P5-PREP-04 · Not run · unblocked by customer #108, please retest
  5. P5-PREP-05: Not run P5-PREP-05 · Not run · ready

P5-PREP-01

Staff Not run
Do this
Sign in to the live staff portal with your own account and open Tests.
Expected
Tests opens. Your name shows on the results you record.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-PREP-01 yet.

P5-PREP-02 →

P5-PREP-02

Customer Not run
Do this
Sign in to the live customer portal as this phase's named test building owner.
Expected
You are signed in as the test owner, not as a real customer.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-PREP-02 yet.

← P5-PREP-01 P5-PREP-03 →

P5-PREP-03

Contractor Not run
Do this
Sign in to the live contractor portal as your pre-loaded practice contractor. Every tester has one, already approved (contractor #93); Phase 2 is skipped this round, so nobody registers a new company.
Expected
The company shows as approved and can start a project.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-PREP-03 yet.

← P5-PREP-02 P5-PREP-04 →

P5-PREP-04

Contractor Not run
Do this
Open the project approved in Phase 4.
Expected
The project shows as approved.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-PREP-04 yet.

← P5-PREP-03 P5-PREP-05 →

P5-PREP-05

Staff Not run
Do this
Write the case ID for each test of this phase in its first step's note.
Expected
Every test in this phase has a case ID that names its made-up records.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-PREP-05 yet.

← P5-PREP-04

Submit for payment

0 pass · 0 fail · 3 blocked · 2 not run.

  1. P5-SUBMIT-01: Blocked P5-SUBMIT-01 · Blocked by contractor #133
  2. P5-SUBMIT-02: Blocked P5-SUBMIT-02 · Blocked by contractor #133
  3. P5-SUBMIT-03: Not run P5-SUBMIT-03 · Not run · ready
  4. P5-SUBMIT-04: Not run P5-SUBMIT-04 · Not run · unblocked by contractor #80, staff #227, please retest
  5. P5-SUBMIT-05: Blocked P5-SUBMIT-05 · Blocked by staff #289, staff #320

P5-SUBMIT-01

Contractor Blocked
Do this
On the project approved in Phase 4, open Work finished and payment (section 4 of a HOMES project, 8 of a HEAR one). Upload practice-document.pdf as the final invoice, the install photos and the signed offer letter.
Expected
Each upload is listed under its kind. Request payment stays off until all three are there.
Sample file
practice-document.pdf

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-SUBMIT-01 yet.

P5-SUBMIT-02 →

P5-SUBMIT-02

Contractor Blocked
Do this
In Work finished and payment, enter the date the work finished, the invoice date and total, the rebate you are requesting and the date the owner signed the offer letter. Tick both confirmations and choose Request payment.
Expected
A receipt starting PAY- shows. The project reads Payment requested, waiting for review.

Blocked by contractor #133.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-SUBMIT-02 yet.

← P5-SUBMIT-01 P5-SUBMIT-03 →

P5-SUBMIT-03

Customer Not run
Do this
As the test owner, open the building's project.
Expected
It shows the work is complete and waiting for payment review.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-SUBMIT-03 yet.

← P5-SUBMIT-02 P5-SUBMIT-04 →

P5-SUBMIT-04

Staff Not run
Do this
On the live staff portal, find the payment request.
Expected
It shows on the project's Redemption review tab, with the project and building.

Unblocked by contractor #80, staff #227 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-SUBMIT-04 yet.

← P5-SUBMIT-03 P5-SUBMIT-05 →

P5-SUBMIT-05

Staff Blocked
Do this
Open each uploaded document.
Expected
Each document listed on the payment request opens.

Blocked by staff #289, staff #320. Already shipped: contractor #63, contractor #80, staff #227.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-SUBMIT-05 yet.

← P5-SUBMIT-04

Clean up

0 pass · 0 fail · 1 not run.

  1. P5-CLEAN-01: Not run P5-CLEAN-01 · Not run · unblocked by customer #106, please retest

P5-CLEAN-01

Staff Not run
Do this
Run the documented cleanup for this phase's test accounts, and record the before and after counts.
Expected
Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5-CLEAN-01 yet.

Before you start

0 pass · 0 fail · 4 not run.

  1. P5_5-PREP-01: Not run P5_5-PREP-01 · Not run · ready
  2. P5_5-PREP-02: Not run P5_5-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P5_5-PREP-03: Not run P5_5-PREP-03 · Not run · unblocked by contractor #63, please retest
  4. P5_5-PREP-04: Not run P5_5-PREP-04 · Not run · ready

P5_5-PREP-01

Staff Not run
Do this
Sign in to the live staff portal with your own account and open Tests.
Expected
Tests opens. Your name shows on the results you record.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-PREP-01 yet.

P5_5-PREP-02 →

P5_5-PREP-02

Customer Not run
Do this
Sign in to the live customer portal as this phase's named test building owner.
Expected
You are signed in as the test owner, not as a real customer.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-PREP-02 yet.

← P5_5-PREP-01 P5_5-PREP-03 →

P5_5-PREP-03

Staff Not run
Do this
Find the payment request submitted in Phase 5.
Expected
It shows waiting for review.

Unblocked by contractor #63 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-PREP-03 yet.

← P5_5-PREP-02 P5_5-PREP-04 →

P5_5-PREP-04

Staff Not run
Do this
Write the case ID for each test of this phase in its first step's note.
Expected
Every test in this phase has a case ID that names its made-up records.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-PREP-04 yet.

← P5_5-PREP-03

Quality visit

0 pass · 0 fail · 8 not run.

  1. P5_5-VISIT-01: Not run P5_5-VISIT-01 · Not run · ready
  2. P5_5-VISIT-02: Not run P5_5-VISIT-02 · Not run · ready
  3. P5_5-VISIT-03: Not run P5_5-VISIT-03 · Not run · ready
  4. P5_5-VISIT-04: Not run P5_5-VISIT-04 · Not run · ready
  5. P5_5-VISIT-05: Not run P5_5-VISIT-05 · Not run · ready
  6. P5_5-VISIT-06: Not run P5_5-VISIT-06 · Not run · ready
  7. P5_5-VISIT-07: Not run P5_5-VISIT-07 · Not run · ready
  8. P5_5-VISIT-08: Not run P5_5-VISIT-08 · Not run · ready

P5_5-VISIT-01

Staff Not run
Do this
Pick the project for a quality visit.
Expected
The visit shows Waiting to be scheduled.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-VISIT-01 yet.

P5_5-VISIT-02 →

P5_5-VISIT-02

Customer Not run
Do this
As the test owner, open the project.
Expected
It shows the visit is waiting to be scheduled, and who to contact.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-VISIT-02 yet.

← P5_5-VISIT-01 P5_5-VISIT-03 →

P5_5-VISIT-03

Staff Not run
Do this
Book a time for the visit.
Expected
The visit shows Scheduled, with the time.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-VISIT-03 yet.

← P5_5-VISIT-02 P5_5-VISIT-04 →

P5_5-VISIT-04

Customer Not run
Do this
As the test owner, open the project.
Expected
It shows the booked date and time.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-VISIT-04 yet.

← P5_5-VISIT-03 P5_5-VISIT-05 →

P5_5-VISIT-05

Staff Not run
Do this
Move the visit to a new time.
Expected
The new time is the visit's time. The old one is kept in the history.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-VISIT-05 yet.

← P5_5-VISIT-04 P5_5-VISIT-06 →

P5_5-VISIT-06

Customer Not run
Do this
As the test owner, open the project.
Expected
Only the new time shows as the visit's time.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-VISIT-06 yet.

← P5_5-VISIT-05 P5_5-VISIT-07 →

P5_5-VISIT-07

Staff Not run
Do this
Record the visit's result.
Expected
The visit shows Complete with its result.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-VISIT-07 yet.

← P5_5-VISIT-06 P5_5-VISIT-08 →

P5_5-VISIT-08

Customer Not run
Do this
As the test owner, open the project.
Expected
The visit shows Complete.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-VISIT-08 yet.

← P5_5-VISIT-07

Automatic picking

0 pass · 0 fail · 4 not run.

  1. P5_5-PICK-01: Not run P5_5-PICK-01 · Not run · unblocked by staff #208, staff #228, please retest
  2. P5_5-PICK-02: Not run P5_5-PICK-02 · Not run · unblocked by staff #208, staff #228, please retest
  3. P5_5-PICK-03: Not run P5_5-PICK-03 · Not run · unblocked by staff #208, staff #228, please retest
  4. P5_5-PICK-04: Not run P5_5-PICK-04 · Not run · unblocked by staff #208, staff #228, please retest

P5_5-PICK-01

Staff Not run
Do this
Open Automatic quality-visit picks and check one contractor's first five finished projects.
Expected
All five were picked without anyone choosing them.

Unblocked by staff #208, staff #228 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-PICK-01 yet.

P5_5-PICK-02 →

P5_5-PICK-02

Staff Not run
Do this
Check that contractor's finished projects after their first five.
Expected
At least 5% of them were picked at random.

Unblocked by staff #208, staff #228 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-PICK-02 yet.

← P5_5-PICK-01 P5_5-PICK-03 →

P5_5-PICK-03

Staff Not run
Do this
Check a finished project with a rebate of $40,000 or more.
Expected
It was picked without anyone choosing it.

Unblocked by staff #208, staff #228 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-PICK-03 yet.

← P5_5-PICK-02 P5_5-PICK-04 →

P5_5-PICK-04

Staff Not run
Do this
Check a project finished after that contractor had a visit with items to resolve.
Expected
It was picked without anyone choosing it.

Unblocked by staff #208, staff #228 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-PICK-04 yet.

← P5_5-PICK-03

Clean up

0 pass · 0 fail · 1 not run.

  1. P5_5-CLEAN-01: Not run P5_5-CLEAN-01 · Not run · unblocked by customer #106, please retest

P5_5-CLEAN-01

Staff Not run
Do this
Run the documented cleanup for this phase's test accounts, and record the before and after counts.
Expected
Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P5_5-CLEAN-01 yet.

Before you start

0 pass · 0 fail · 5 not run.

  1. P6-PREP-01: Not run P6-PREP-01 · Not run · ready
  2. P6-PREP-02: Not run P6-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P6-PREP-03: Not run P6-PREP-03 · Not run · ready
  4. P6-PREP-04: Not run P6-PREP-04 · Not run · unblocked by contractor #63, please retest
  5. P6-PREP-05: Not run P6-PREP-05 · Not run · ready

P6-PREP-01

Staff Not run
Do this
Sign in to the live staff portal with your own account and open Tests.
Expected
Tests opens. Your name shows on the results you record.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-PREP-01 yet.

P6-PREP-02 →

P6-PREP-02

Customer Not run
Do this
Sign in to the live customer portal as this phase's named test building owner.
Expected
You are signed in as the test owner, not as a real customer.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-PREP-02 yet.

← P6-PREP-01 P6-PREP-03 →

P6-PREP-03

Contractor Not run
Do this
Sign in to the live contractor portal as your pre-loaded practice contractor. Every tester has one, already approved (contractor #93); Phase 2 is skipped this round, so nobody registers a new company.
Expected
The company shows as approved and can start a project.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-PREP-03 yet.

← P6-PREP-02 P6-PREP-04 →

P6-PREP-04

Staff Not run
Do this
Have a separate payment request ready for each test, each on its own approved project.
Expected
Three payment requests wait for review, labeled P6-APPROVE, P6-CORRECT and P6-REFUSE.

Unblocked by contractor #63 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-PREP-04 yet.

← P6-PREP-03 P6-PREP-05 →

P6-PREP-05

Staff Not run
Do this
Write the case ID for each test of this phase in its first step's note.
Expected
Every test in this phase has a case ID that names its made-up records.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-PREP-05 yet.

← P6-PREP-04

Approve and pay

0 pass · 0 fail · 1 blocked · 5 not run.

  1. P6-APPROVE-01: Not run P6-APPROVE-01 · Not run · unblocked by contractor #80, staff #227, please retest
  2. P6-APPROVE-02: Not run P6-APPROVE-02 · Not run · unblocked by contractor #80, staff #227, please retest
  3. P6-APPROVE-03: Blocked P6-APPROVE-03 · Blocked by staff #322
  4. P6-APPROVE-04: Not run P6-APPROVE-04 · Not run · ready
  5. P6-APPROVE-05: Not run P6-APPROVE-05 · Not run · ready
  6. P6-APPROVE-06: Not run P6-APPROVE-06 · Not run · unblocked by contractor #80, staff #227, please retest

P6-APPROVE-01

Staff Not run
Do this
Open P6-APPROVE's Redemption review tab, press Approve, and tick the completion documents, invoice and photo checks. Press Save.
Expected
Each check saves with your name.

Unblocked by contractor #80, staff #227 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-APPROVE-01 yet.

P6-APPROVE-02 →

P6-APPROVE-02

Staff Not run
Do this
With every redemption check done, press Approve in the Redemption review drawer.
Expected
The redemption review shows Passed. The payment checks on the Payment review tab are next.

Unblocked by contractor #80, staff #227 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-APPROVE-02 yet.

← P6-APPROVE-01 P6-APPROVE-03 →

P6-APPROVE-03

Staff Blocked
Do this
Press Approve on the Payment review tab. In the drawer, record why any other claim on the address is not a duplicate, tick each check or say why it does not apply, and press Approve for payment.
Expected
The payment review saves as approved.

Blocked by staff #322.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-APPROVE-03 yet.

← P6-APPROVE-02 P6-APPROVE-04 →

P6-APPROVE-04

Staff Not run
Do this
Once SPECTRUM has paid it, mark the rebate Paid with its payment date.
Expected
The project shows Paid.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-APPROVE-04 yet.

← P6-APPROVE-03 P6-APPROVE-05 →

P6-APPROVE-05

Customer Not run
Do this
As the test owner, open the project.
Expected
It shows Paid.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-APPROVE-05 yet.

← P6-APPROVE-04 P6-APPROVE-06 →

P6-APPROVE-06

Contractor Not run
Do this
Open the project on the contractor portal.
Expected
It shows Paid.

Unblocked by contractor #80, staff #227 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-APPROVE-06 yet.

← P6-APPROVE-05

Send back

0 pass · 0 fail · 4 not run.

  1. P6-CORRECT-01: Not run P6-CORRECT-01 · Not run · unblocked by contractor #80, staff #227, please retest
  2. P6-CORRECT-02: Not run P6-CORRECT-02 · Not run · unblocked by contractor #80, staff #227, please retest
  3. P6-CORRECT-03: Not run P6-CORRECT-03 · Not run · unblocked by contractor #63, contractor #80, staff #227, please retest
  4. P6-CORRECT-04: Not run P6-CORRECT-04 · Not run · unblocked by contractor #80, staff #227, please retest

P6-CORRECT-01

Staff Not run
Do this
On P6-CORRECT's Redemption review tab, press Send back and name one problem.
Expected
The redemption review shows Failed with the problem.

Unblocked by contractor #80, staff #227 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-CORRECT-01 yet.

P6-CORRECT-02 →

P6-CORRECT-02

Contractor Not run
Do this
Open the project on the contractor portal.
Expected
It shows Sent back and the problem.

Unblocked by contractor #80, staff #227 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-CORRECT-02 yet.

← P6-CORRECT-01 P6-CORRECT-03 →

P6-CORRECT-03

Contractor Not run
Do this
Fix the problem and send it again.
Expected
It shows waiting for review again.

Unblocked by contractor #63, contractor #80, staff #227 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-CORRECT-03 yet.

← P6-CORRECT-02 P6-CORRECT-04 →

P6-CORRECT-04

Staff Not run
Do this
Reopen the redemption review.
Expected
Staff see the changed submission.

Unblocked by contractor #80, staff #227 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-CORRECT-04 yet.

← P6-CORRECT-03

Refuse

0 pass · 0 fail · 3 not run.

  1. P6-REFUSE-01: Not run P6-REFUSE-01 · Not run · unblocked by contractor #80, staff #227, please retest
  2. P6-REFUSE-02: Not run P6-REFUSE-02 · Not run · ready
  3. P6-REFUSE-03: Not run P6-REFUSE-03 · Not run · unblocked by contractor #80, staff #227, please retest

P6-REFUSE-01

Staff Not run
Do this
Refuse P6-REFUSE's payment with a plain-language reason.
Expected
The refusal saves with its reason.

Unblocked by contractor #80, staff #227 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-REFUSE-01 yet.

P6-REFUSE-02 →

P6-REFUSE-02

Customer Not run
Do this
As the test owner, open the project.
Expected
It shows Not paid and the reason.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-REFUSE-02 yet.

← P6-REFUSE-01 P6-REFUSE-03 →

P6-REFUSE-03

Contractor Not run
Do this
Open the project on the contractor portal.
Expected
It shows Not paid and the reason.

Unblocked by contractor #80, staff #227 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-REFUSE-03 yet.

← P6-REFUSE-02

Clean up

0 pass · 0 fail · 1 not run.

  1. P6-CLEAN-01: Not run P6-CLEAN-01 · Not run · unblocked by customer #106, please retest

P6-CLEAN-01

Staff Not run
Do this
Run the documented cleanup for this phase's test accounts, and record the before and after counts.
Expected
Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P6-CLEAN-01 yet.

Before you start

0 pass · 0 fail · 4 not run.

  1. P7-PREP-01: Not run P7-PREP-01 · Not run · ready
  2. P7-PREP-02: Not run P7-PREP-02 · Not run · unblocked by customer #106, please retest
  3. P7-PREP-03: Not run P7-PREP-03 · Not run · unblocked by customer #108, please retest
  4. P7-PREP-04: Not run P7-PREP-04 · Not run · ready

P7-PREP-01

Staff Not run
Do this
Sign in to the live staff portal with your own account and open Tests.
Expected
Tests opens. Your name shows on the results you record.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-PREP-01 yet.

P7-PREP-02 →

P7-PREP-02

Customer Not run
Do this
Sign in to the live customer portal as this phase's named test building owner.
Expected
You are signed in as the test owner, not as a real customer.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-PREP-02 yet.

← P7-PREP-01 P7-PREP-03 →

P7-PREP-03

Staff Not run
Do this
Check that Phases 4 to 6 left at least one paid test project.
Expected
At least one test project shows Paid.

Unblocked by customer #108 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-PREP-03 yet.

← P7-PREP-02 P7-PREP-04 →

P7-PREP-04

Staff Not run
Do this
Write the case ID for each test of this phase in its first step's note.
Expected
Every test in this phase has a case ID that names its made-up records.
Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-PREP-04 yet.

← P7-PREP-03

DOE bulk report

0 pass · 0 fail · 8 blocked · 0 not run.

  1. P7-REPORT-01: Blocked P7-REPORT-01 · Blocked by RnD #31, RnD #53 milestone 7
  2. P7-REPORT-02: Blocked P7-REPORT-02 · Blocked by RnD #31, RnD #53 milestone 7
  3. P7-REPORT-03: Blocked P7-REPORT-03 · Blocked by RnD #31, RnD #53 milestone 7
  4. P7-REPORT-04: Blocked P7-REPORT-04 · Blocked by RnD #31, RnD #53 milestone 7
  5. P7-REPORT-05: Blocked P7-REPORT-05 · Blocked by RnD #31, RnD #53 milestone 7
  6. P7-REPORT-06: Blocked P7-REPORT-06 · Blocked by RnD #31
  7. P7-REPORT-07: Blocked P7-REPORT-07 · Blocked by RnD #31, RnD #53 milestone 7
  8. P7-REPORT-08: Blocked P7-REPORT-08 · Blocked by RnD #31, a real paid multifamily rebate, none yet

P7-REPORT-01

Staff Blocked
Do this
On the live staff portal, open Applications, then DOE reporting.
Expected
HOMES (50121) and HEAR (50122) show separately. Each says how many rebates are new, already downloaded, held back and test, and every held-back rebate names what holds it.

Blocked by RnD #31, RnD #53 milestone 7.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-REPORT-01 yet.

P7-REPORT-02 →

P7-REPORT-02

Staff Blocked
Do this
Open the test walk-through section under HOMES, download the TEST HOMES workbook and open it in Excel.
Expected
It opens with no repair prompt. The file name starts TEST-. Instructions shows WI. Fill row 5 is the first test rebate, DOE's example row is gone, and every rebate ID starts TEST-.

Blocked by RnD #31, RnD #53 milestone 7.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-REPORT-02 yet.

← P7-REPORT-01 P7-REPORT-03 →

P7-REPORT-03

Staff Blocked
Do this
Find this phase's test projects from Phases 4 to 6 in the TEST file.
Expected
Each appears once, with the building type, unit counts, income bucket, completion date and paid amount shown on its application. Pass only if every one matches.

Blocked by RnD #31, RnD #53 milestone 7.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-REPORT-03 yet.

← P7-REPORT-02 P7-REPORT-04 →

P7-REPORT-04

Staff Blocked
Do this
Download the real (not TEST) HOMES workbook, or read the page if it refuses, and look for the test accounts' records.
Expected
No test record is in it. The page counts them under test applications left out. With no real paid rebate yet, the page refuses the download and says why.

Blocked by RnD #31, RnD #53 milestone 7. Already shipped: customer #106.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-REPORT-04 yet.

← P7-REPORT-03 P7-REPORT-05 →

P7-REPORT-05

Staff Blocked
Do this
Open a held-back test rebate's Check reporting details.
Expected
Each missing fact is named. Every field that has DOE choices offers only DOE's values. Saving a value outside them is refused and nothing is saved. A saved value shows on the application timeline.

Blocked by RnD #31, RnD #53 milestone 7.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-REPORT-05 yet.

← P7-REPORT-04 P7-REPORT-06 →

P7-REPORT-06

Staff Blocked
Do this
Take a test rebate whose payment review still shows a DOE check needing attention (for example a modeled HOMES project with no energy model file) and look for it on DOE reporting.
Expected
It is held back, the reason names the DOE check, and it is in neither file until the check passes or is explained on the payment review.

Blocked by RnD #31. Already shipped: staff #231.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-REPORT-06 yet.

← P7-REPORT-05 P7-REPORT-07 →

P7-REPORT-07

Staff Blocked
Do this
Download the TEST HEAR workbook and open it in Excel.
Expected
One row per measure, each with its own TEST- rebate ID and its own amounts. Supplemental Product Info has no example row.

Blocked by RnD #31, RnD #53 milestone 7.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-REPORT-07 yet.

← P7-REPORT-06 P7-REPORT-08 →

P7-REPORT-08

Staff Blocked
Do this
When a real paid rebate is ready, download the real workbook, then press Download again.
Expected
The second press is refused because every rebate is already in an earlier download. The application timeline shows the first download with its file fingerprint. Ticking Include already downloaded makes the file again and adds a second timeline entry.

Blocked by RnD #31, a real paid multifamily rebate, none yet.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-REPORT-08 yet.

← P7-REPORT-07

PNNL sandbox upload

0 pass · 0 fail · 1 blocked · 0 not run.

  1. P7-UPLOAD-01: Blocked P7-UPLOAD-01 · Blocked by RnD #31, PNNL sandbox access, no ticket

P7-UPLOAD-01

Staff Blocked
Do this
Upload the TEST HOMES and TEST HEAR files to PNNL's sandbox dashboard, never production.
Expected
PNNL reports success for each file, or names row-level errors. Write every error in what happened; each one is a #234 defect until fixed.

Blocked by RnD #31, PNNL sandbox access, no ticket.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-UPLOAD-01 yet.

Clean up

0 pass · 0 fail · 1 not run.

  1. P7-CLEAN-01: Not run P7-CLEAN-01 · Not run · unblocked by customer #106, please retest

P7-CLEAN-01

Staff Not run
Do this
Run the documented cleanup for this phase's test accounts, and record the before and after counts.
Expected
Every record this phase made is removed or labeled Test. Staff lists and exports no longer show it as real.

Unblocked by customer #106 — please retest.

Result

Paste or drop screenshots into the box, or use the paperclip. Up to 10.

No result has been recorded for P7-CLEAN-01 yet.